Each of these has a page written about Holmen specifically.
The sealable surface here splits between the north parks and the village and school lots in the middle. Sealer does its work on a lot that's still sound and does nothing for one that's failing from the base up. The order on any of these is repair, then crack fill, then seal, then stripe.
Crack Filling and Sealing
Holmen's lots run from brand new in the north parks to school pavement that's been in the ground for decades, and crack filling is the job that keeps the second group from turning into a paving job. Water in an open crack is what takes a base apart and the freeze does the rest. Wide cracks get routed out to a clean face and the rubber goes in hot so it bonds and stays flexible. On the newer lots it shows up at the joints and the edges first.
Asphalt Repair and Patching
The plants on the north end move food and dairy product, which means trucks and tankers on the same aprons every day. Where a loaded truck sits or turns is where the base gives out first, and the pothole that shows up there is the symptom rather than the problem. Repairs in that traffic get cut back square, the base rebuilt to something that compacts, and hot mix rolled in flush. On the school and village lots the failures are older and shallower, and cutting them out still beats filling them.
The north parks went in with village water and sewer mains and the site checks that came with the shovel-ready certification, so the drainage in those lots is engineered and the structures in them are worth keeping right. A frame that settles takes the asphalt around it down with it, and the lot's low point moves somewhere nobody planned. Fixing it is the structure, a new collar and the asphalt keyed back in so water still runs to the grate. On the older village and school lots the same thing has been happening longer.
School lots are the striping question in Holmen: the high school on McHugh Road, the middle school and four elementary buildings, all running buses and parent drop-off at the same time of day. Bus loops, drop-off lanes and marked crossings get laid out for that, and the ADA stalls and access aisles go in at the federal dimensions on the shortest route to the doors. On the industrial side it's trailer stalls and truck routes through a yard. A restripe goes on after the sealer has cured.
Track and Athletic Surfaces
Empire Stadium at the high school is home to Holmen football and track and field, with a turf playing surface and spectator seating, and tennis is played off campus at the Deerwood courts on Anderson Street and the Viking Elementary courts on Wall Street East. Work on a track or a court starts with what's under it and what the drainage does, and it happens in the summer.
Dock aprons at the plants in the north parks take tankers and trailers standing still, which is a point load rather than a rolling one and the reason an apron poured like a sidewalk fails early. Those aprons see the same trucks in the same places every day, so what goes in has to be built for repetition. Around the schools and the Municipal Center it's curb and gutter, walks, and curb ramps at the federal dimensions. Commercial pours go down at 4,500 PSI with tied rebar.
Holmen's ordinance puts the walk on the property owner and gives the dimensions: five feet wide, four inches deep, six inches where a driveway crosses it, and the back of the walk four inches above the top of the curb. The Village has to be told at least ten days before a walk goes in, and nobody pours public sidewalk here without permission first. The repair clock is short: 24 hours after the Director of Public Works notifies an owner about a damaged walk, the Village can do the work itself and put the cost on the next annual tax roll. Once a street has been permanently improved or repaved, no permit to open, cut or excavate it is issued for five years unless the Board of Public Works finds an emergency. The commercial frontage runs up Highways 53 and 35 through the north parks where Kwik Trip, XeteX, Dairyland and Holmen Cheese sit, and snow and ice have to be off a public walk within 48 hours of a snowfall.
There are four business parks on the north end and around 60 percent of the North Holmen park is still open ground, so new lots are a live question here in a way they aren't in most of these towns. New ground gets built base first, graded, compacted and drained, because the base decides how long the surface lasts. The December 2025 shovel-ready certification covered soil, utilities, zoning and ownership, so a lot of what anybody needs to know about those sites is already documented. On the older village and school lots it's an overlay or a tear-out, depending on whether the base is still sound.