Eau Claire, WI · Northwestern Wisconsin Open now (715) 450-9897

Commercial · I-94 West to the Twin Cities

Commercial Pavement Maintenance in Baldwin, Wisconsin

Parking lot sealcoating, crack filling, patching, catch basin repair, striping, concrete pads and aprons, and lot paving for commercial properties in Baldwin. About 50 minutes west of Eau Claire on I-94, and the estimate is free.

4,352people
I-94 West to the Twin Citiesthe road out of Eau Claire
Lots onlyno driveways, no plowing

The Lots and Surfaces in Baldwin

Baldwin is a village of about 4,400 in St. Croix County, sitting at I-94 Exit 19 where US 63 crosses the interstate. It's about 49 miles west of Eau Claire and about 48 miles east of Minneapolis, and the county it's in is counted as part of the Minneapolis-St. Paul metro. US 12 and US 63 run through the village on top of the interstate. The county seat is Hudson, further west on I-94.

The industrial ground here has names on it. The I-94 Industrial Park and Baldwin East, a commercial and light industrial park, are the two the village markets, and TID No. 7 is a 258-acre mixed-use district at the south end created in 2007 to bring industrial and commercial development in. The plants are where the big private lots are: Vital Plastics runs injection molding out of about 70,000 square feet across two buildings on VandeBerg Street, Skycoat does powder coating, e-coating and wet painting on Evergreen Street, and Donaldson has a Baldwin plant.

The rest of the commercial surface is the interchange and the hospital. Exit 19 carries a truck stop and three more fuel and convenience stops, plus a pair of hotels off Baldwin Plaza Drive. Western Wisconsin Health is a 25-bed hospital on Bergslien Street just off the interstate, and it runs clinics in Roberts and Spring Valley too. In the village itself the stores are along Cedar Street, and the school district keeps Greenfield Elementary and Baldwin-Woodville Area High School here, with the middle school over in Woodville.

Where the lots are in Baldwin

  • I-94 Industrial Park
  • Baldwin East
  • TID No. 7 at the south end of the village
  • The Exit 19 interchange

Around Baldwin: I-94 Exit 19 at US 63, Western Wisconsin Health on Bergslien Street, The 1905 Red Church outside the village, Nilssen's Foods on Cedar Street, Baldwin-Woodville Area High School on 13th Avenue.

4,352 people, 2024 Census estimate.

St. Croix County is glacial ground: moraine running from clay through to boulders across most of the eastern county, and an outwash plain of stratified gravel, sand, silt and clay in the southwestern corner. Which one is under a lot changes what the frost does to it.

What We Do in Baldwin

Each of these has a page written about Baldwin specifically.

Sealcoating

The lots worth sealing in Baldwin are the hospital campus on Bergslien Street, the plant yards in the two industrial parks, the store lots on Cedar Street and the aprons at Exit 19. Minnesota has banned the sale and use of coal tar sealer statewide since 2014, so a management company in the east metro often carries a no-coal-tar line in its spec, and that line follows the building across the river. Wisconsin has no statewide ban and neither Baldwin nor St. Croix County has passed one, so nothing local decides it here. We run an asphalt emulsion, which is the same answer for a spec that asks and a spec that doesn't.

Crack Filling and Sealing

A lot at the interchange takes loaded trucks over the same path all day, and a crack in that path opens faster than one out in the parking rows. St. Croix County's ground is glacial moraine, anything from clay through to boulders, and frost works it every winter. Wide cracks get routed to a clean face first, and the rubber goes in at 400 degrees so it reaches the bottom of the crack and bonds to the walls. Cold pour out of a pail lifts out in strips by spring.

Asphalt Repair and Patching

Exit 19 is usually where the worst of it is. Truck stop aprons, fuel islands and the drives feeding them take turning weight from loaded trucks, and once that shows up as a pothole it's a base problem rather than a surface one. The plant yards on VandeBerg Street and Evergreen Street are the other kind of lot in town, where the pavement that carries trucks is a small part of a big surface. Either way the repair is cut back square to sound asphalt, the base dug out to something firm and rebuilt, then hot mix rolled in flush.

Catch Basin Repair

The lots with storm structures in them here are the big flat ones: the hospital campus off the interstate, the two industrial parks and the pavement around the interchange. A basin under a truck route takes weight all day, and the joint between the frame and the structure is where twenty winters of water gets in. The sign is never the grate; it's the asphalt breaking up in a ring around it. Rebuilt means the structure, a new collar and the asphalt keyed back in at the right pitch.

Parking Lot Striping

The hospital on Bergslien Street is a public lot, and public means ADA stalls and access aisles at the federal dimensions, fire lanes marked, and a layout a first-time visitor can read. The school lots are the same kind of job on a different calendar. At Exit 19 the question changes again: a truck stop lot has to hold trucks and trailers in a layout that lets them get back out. All of it gets measured and chalked before paint, and a restripe on a sealed lot waits for the sealer to cure.

Track and Athletic Surfaces

Baldwin-Woodville Area High School is on 13th Avenue with a little over 500 students, and the district fields boys' and girls' track and field and tennis. Greenfield Elementary is in the village too and the middle school is in Woodville. District voters passed a facilities referendum for building upgrades. Track and court work anywhere is a summer-window job, and every district in this part of the state is working the same few weeks.

Concrete

Dumpster pads behind the Cedar Street stores, dock aprons at the plants on VandeBerg and Evergreen Street, curb and gutter around the hospital campus. A pad gets sized for the front axle of a loaded refuse truck rather than for the container standing on it. Commercial pours go down at 4,500 PSI with tied rebar, and the asphalt around them gets keyed back in.

Asphalt Paving

TID No. 7 is 258 acres at the south end of the village, created to bring industrial and commercial development in, and the I-94 Industrial Park and Baldwin East are the two parks the village markets to builders. An apartment complex is going up on Gracie Drive next to the interstate. A new lot goes down on a graded, compacted, drained base or it doesn't go down at all, because the base decides how long the surface lasts. On a lot that's already there the choice is overlay or tear-out, and it comes down to whether that base is still sound.

Questions From Baldwin

What property owners and managers here ask, answered.

More about commercial work
Baldwin's 50 minutes out. Do you come this far for a lot?
For commercial lots, yes. It's about 49 miles straight out I-94 to Exit 19, right around 50 minutes. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Our lot can't close for a day. What does sealing actually need?
Sealed asphalt needs 24 to 48 hours before traffic goes back on it. On a lot that can't close, where that time comes from is part of what the estimate works out, so tell us which hours and which areas you can't lose.

Get a Free Estimate in Baldwin

Tell us about the property and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Baldwin
  • A photo of the lot helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?