Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Holmen

Concrete in Holmen, Wisconsin.

Dumpster pads, dock aprons, curb and gutter for commercial properties in Holmen. Poured at 4,500 PSI with tied rebar, and the asphalt around it tied back in.

4.7 from 21 Google reviews

About an hour and forty-five minutes southeast of Eau Claire on Highway 93 and Highway 53. The estimate is free.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
4.7 Google ratingFrom 21 reviews
4,500 PSI Exterior mixTied rebar where it carries trucks
3 days Back in serviceOn a dock apron we poured

Working in Holmen

Dock aprons at the plants in the north parks take tankers and trailers standing still, which is a point load rather than a rolling one and the reason an apron poured like a sidewalk fails early. Those aprons see the same trucks in the same places every day, so what goes in has to be built for repetition. Around the schools and the Municipal Center it's curb and gutter, walks, and curb ramps at the federal dimensions. Commercial pours go down at 4,500 PSI with tied rebar.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Holmen

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Holmen

Base, forms, steel, pour, finish, and the asphalt tied back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt cut tight to the new edge, compacted, joint sealed.

Questions We Get in Holmen

What Holmen calls us about, answered straight.

More questions answered
Holmen's off the interstate. Do you still come out?
Yes, for commercial lots. It's about 73 miles from Eau Claire, an hour and forty-five minutes down Highway 93 and Highway 53, and the village sits ten miles up from I-90 Exit 4. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

The Lots and Surfaces in Holmen

Holmen is a village of about 11,900 in La Crosse County, up US 53 from I-90 Exit 4, in what the county calls its primary growth corridor. It runs roughly seven miles north to south along Highways 53 and 35, and it's one of the faster growing communities in the state. From Eau Claire it's about 73 miles, an hour and forty-five minutes down Highway 93 and Highway 53.

The industrial ground is all on the north end. The North Holmen Industrial Area is just over 100 acres with about 81 of them developable, zoned light industrial, half a mile from four-lane Highway 53 and ten miles from I-90, with village water and sewer mains, gas along Granary Street and power on site. Kwik Trip, XeteX, Dairyland and Holmen Cheese are already in the North Holmen park, and around 60 percent of that land is still open. Bluffview, Hawkeye and McGilvray are the other three parks up there, and all of them were certified shovel-ready in December 2025 after checks on soil, utilities, zoning and ownership.

The other lots that matter belong to the village and the school district. The Municipal Center is here, and the district runs Holmen High School on McHugh Road with about 1,200 students, a middle school and four elementary schools. In April 2026 voters passed an operational referendum for programming, safety and maintenance, and it explicitly does not fund new buildings, which puts the money on the buildings and grounds already there.

Where we work in Holmen

  • North Holmen Industrial Park
  • Bluffview Business Park
  • Hawkeye Business Park
  • McGilvray Park
  • Highway 35 and Highway 53

Around Holmen: Star Hill, Empire Stadium at Holmen High School, The Holmen Municipal Center, The old Holmen Bank building at Main and State, Drugan's Golf Club on Sylvester Road.

11,866 people, 2024 Census estimate.

La Crosse County is in the Driftless Area, never glaciated, with the bedrock near the surface and loess over much of it. Star Hill, the bluff behind the village with the lit star on it, is what that looks like from the road.

Get a Free Estimate in Holmen

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Holmen
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?