Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Tomah

Concrete in Tomah, Wisconsin.

Dumpster pads, dock aprons, curb and gutter for commercial properties in Tomah. Poured at 4,500 PSI with tied rebar, and the asphalt around it tied back in.

4.7 from 21 Google reviews

About an hour and fifteen minutes southeast of Eau Claire on I-94 and I-90. The estimate is free.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
4.7 Google ratingFrom 21 reviews
4,500 PSI Exterior mixTied rebar where it carries trucks
3 days Back in serviceOn a dock apron we poured

Working in Tomah

Dock aprons are the concrete that matters most in Tomah. A trailer parked on its landing gear puts a load on one small patch and leaves it there for hours, and an apron poured like a sidewalk cracks under that in a couple of seasons. Dumpster pads behind the retail on West McCoy Boulevard are the other regular one, and it's the truck that empties the container that decides how thick a pad has to be. Curb and gutter runs through the newer commercial ground off the interstate.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Tomah

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Tomah

Base, forms, steel, pour, finish, and the asphalt tied back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt cut tight to the new edge, compacted, joint sealed.

Questions We Get in Tomah

What Tomah calls us about, answered straight.

More questions answered
How far southeast do you come?
Tomah is about 81 miles from Eau Claire, an hour and fifteen minutes down I-94 and then west on I-90, and for commercial lots we come. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

The Lots and Surfaces in Tomah

Tomah is in Monroe County, a city of about 9,600 at the point where I-90 and I-94 divide, and that split is most of the reason the town looks the way it does. It's 81 miles from Eau Claire, about an hour and fifteen minutes, and 40 miles east of La Crosse. Exit 43 off I-90 is US 12 and Highway 16, and Highways 21 and 131 come through as well.

Freight is why the lots here are big. The city names Cardinal IG and Cardinal TG, Toro, Exopack, USEMCO, Meca Sportswear, Mars Pet Care and a Walmart distribution center among its employers, along with local and statewide trucking firms, and says outright that distribution companies locate in Tomah because the two interstates divide there. Ocean Spray's plant runs three lines and turns out 31 million pounds of sweetened dried cranberries and concentrate a year. Monroe County lists three business properties in the city, I-90 Corridor Land, Meadows Park and Forward Tomah Land, most of them inside tax increment districts.

The largest single campus is the Tomah VA Medical Center on East Veterans Street, 174 acres and 266 beds serving veterans across 16 counties in Wisconsin and Minnesota. Tomah Health, Gundersen and a Mayo clinic are also in town, the Walmart Supercenter is on West McCoy Boulevard a minute off the interstate, and the school district runs eight elementary schools, a middle school and the high school on Lincoln Avenue. Western Technical College has a campus on East Milwaukee Street, and Tomah sits between Fort McCoy and Volk Field.

Where we work in Tomah

  • I-90 Corridor Land
  • Meadows Park
  • Forward Tomah Land
  • West McCoy Boulevard
  • The I-90 and I-94 split

Around Tomah: Tomah VA Medical Center on East Veterans Street, Lake Tomah, The point where I-90 and I-94 divide, The Tomah Amtrak stop, The old Tomah Post Office.

9,574 people, 2024 Census estimate.

Monroe County is on the Driftless side of the state, the part the glaciers went around.

Get a Free Estimate in Tomah

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Tomah
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?