Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Track and Athletic Surfaces in Tomah

Track and Athletic Surfaces in Tomah, Wisconsin.

Track and court resurfacing for schools in and around Tomah, scheduled into the summer window.

4.7 from 21 Google reviews

About an hour and fifteen minutes southeast of Eau Claire on I-94 and I-90. The estimate is free.

A resurfaced asphalt running track with crisp white lane lines, painted lane numbers and colored exchange markings, playing field beyond.
4.7 Google ratingFrom 21 reviews
Summer Work windowBetween seasons
Measured Lane stripingEvery lane the same width

Working in Tomah

The Tomah Area School District runs eight elementary schools, Tomah Middle School and Tomah High School on Lincoln Avenue, a little over 3,000 students in all, and the teams play in the Mississippi Valley Conference. In November 2024 voters turned down a capital referendum that would have built a new high school, so the buildings and the surfaces around them are the ones staying in service. Track and court work is summer work, and what's under a surface decides what the job actually is.

From our jobs

Job Photos

A resurfaced running track with fresh white lane lines, painted lane numbers and yellow exchange marks
Lane lines and numbers, back on after resurfacing
A resurfaced running track curve with white lane lines and colored relay exchange zone markers
Relay exchange zones, measured and marked

All job photos

What makes track work different

The surface work is the same trade. Clean it, fill what has opened up, seal it, and it lasts. What's different is everything downstream of the paint gun. Lane lines are set from a measured stagger so that every lane runs the same distance. Exchange zones and acceleration zones have defined lengths and have to be marked in the right colors to be read at speed. Get the layout wrong and you have a facility that looks finished and can't host a meet, which is a problem nobody notices until the day it matters.

What Decides the Price in Tomah

These are ranges. Anything at this scale is walked and measured before it is quoted, because condition and layout move the number far more than square footage does.

Restripe only

Existing layout, surface sound

Measured on site

  • Lanes, exchange and acceleration zones, numbers
  • Layout taken from the existing measured stagger

Courts

Tennis, basketball, pickleball

Measured on site

  • Per court, depending on condition and color coating
  • Multiple courts on one visit come down per court

Public bodies usually need a bid they can put against a budget line, often a season ahead. Ask in the fall for work the following summer and you'll get a better number and a better slot.

How the Work Goes in Tomah

Track work happens in the summer window between seasons.

Walk it, measure it, write it

Condition survey and a measured check of the existing layout before anything is quoted. If the stagger has drifted from an earlier restripe, that gets found now rather than after the paint is down.

Crack repair

Hot rubber at 400 degrees into anything that has opened up. On a track this matters more than on a lot, because a crack across a running lane is a trip hazard as well as a leak.

Clean and seal

The whole surface, edge to edge. This is the step that buys the years and it is the one that gets deferred, because a faded track still works.

Lay out the lines

Chalked from measurements, checked, then painted. Lanes, exchange and acceleration zones, start lines, and lane numbers.

Hand it back clean

Cured, swept, and ready for the season.

Questions We Get in Tomah

What Tomah calls us about, answered straight.

More questions answered
How far southeast do you come?
Tomah is about 81 miles from Eau Claire, an hour and fifteen minutes down I-94 and then west on I-90, and for commercial lots we come. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Our school lots have to be done between school years. Is that enough time?
It usually is, and the part that decides it is the calendar rather than the work. Sealer needs warm, dry pavement and 24 to 48 hours before traffic goes back on; crack filling and repair have a wider window than that. Getting the lot walked and measured in the spring is what makes a summer date real.
When can track work be done?
Summer, between seasons. Sealer needs warm dry weather and a proper cure, and a track needs to be closed while that happens, so the window is roughly June through August in Tomah and the surrounding area. Book in the winter for the following summer.
How often does an asphalt track need resealing?
Every three to five years for the seal, and crack filling as often as it needs it, which in Tomah and the surrounding area is usually annually on an older track. Lines get relaid with the seal, because sealing over them removes them.
Can you restripe a track without resurfacing it?
Yes, and it is often the right call when the surface is sound and only the lines have faded. It buys a few years before the surface work is genuinely due. What it costs depends on the layout: lane count, whether the exchange zones and the field events are being reinstated, and whether the existing lines can be followed or have to be set out again.
Do you do tennis, basketball and pickleball courts?
Yes. Same trade, smaller and simpler layout. Multiple courts done on one visit cost less per court because the trip is already paid for.
Can you put track and court work out as a formal bid?
Yes. Written scope, measured quantities and a firm number, in whatever format your district needs it, and early enough to sit in next year's budget.

The Lots and Surfaces in Tomah

Tomah is in Monroe County, a city of about 9,600 at the point where I-90 and I-94 divide, and that split is most of the reason the town looks the way it does. It's 81 miles from Eau Claire, about an hour and fifteen minutes, and 40 miles east of La Crosse. Exit 43 off I-90 is US 12 and Highway 16, and Highways 21 and 131 come through as well.

Freight is why the lots here are big. The city names Cardinal IG and Cardinal TG, Toro, Exopack, USEMCO, Meca Sportswear, Mars Pet Care and a Walmart distribution center among its employers, along with local and statewide trucking firms, and says outright that distribution companies locate in Tomah because the two interstates divide there. Ocean Spray's plant runs three lines and turns out 31 million pounds of sweetened dried cranberries and concentrate a year. Monroe County lists three business properties in the city, I-90 Corridor Land, Meadows Park and Forward Tomah Land, most of them inside tax increment districts.

The largest single campus is the Tomah VA Medical Center on East Veterans Street, 174 acres and 266 beds serving veterans across 16 counties in Wisconsin and Minnesota. Tomah Health, Gundersen and a Mayo clinic are also in town, the Walmart Supercenter is on West McCoy Boulevard a minute off the interstate, and the school district runs eight elementary schools, a middle school and the high school on Lincoln Avenue. Western Technical College has a campus on East Milwaukee Street, and Tomah sits between Fort McCoy and Volk Field.

Where we work in Tomah

  • I-90 Corridor Land
  • Meadows Park
  • Forward Tomah Land
  • West McCoy Boulevard
  • The I-90 and I-94 split

Around Tomah: Tomah VA Medical Center on East Veterans Street, Lake Tomah, The point where I-90 and I-94 divide, The Tomah Amtrak stop, The old Tomah Post Office.

9,574 people, 2024 Census estimate.

Monroe County is on the Driftless side of the state, the part the glaciers went around.

Get a Free Estimate in Tomah

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Tomah
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?