Concrete in Spooner
Concrete in Spooner, Wisconsin.
Dumpster pads, dock aprons, curb and gutter for commercial properties in Spooner. Poured at 4,500 PSI with tied rebar, and the asphalt around it tied back in.
About an hour and a half north of Eau Claire on Highway 53. The estimate is free.

Working in Spooner
Dock aprons at the warehouses in the development districts, dumpster pads behind the downtown businesses, curb and gutter around the hospital. Poured at 4,500 PSI with tied rebar on the commercial side, with the asphalt around it tied back in so the joint is somebody's responsibility.
The joint between concrete and asphalt
Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.
What Decides the Price in Spooner
Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.
Garage or dock apron
Per project
Measured on site
- Thicker slab, tied rebar, asphalt tied back in
Dumpster pad
Per pad
Measured on site
- Heavy slab, because a loaded truck on a hot day is the worst case
- Sized to the truck, not to the dumpster
Curb and gutter
Per linear foot
Measured on site
- Straight run at the low end, radius work at the high end
What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.
How the Work Goes in Spooner
Base, forms, steel, pour, finish, and the asphalt tied back in against it.
Take out what's there
Broken slab out and hauled away, down to whatever the new pour needs to sit on.
Prepare and compact the base
Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.
Form and reinforce
Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.
Pour and finish
Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.
Tie the asphalt back in
The step most concrete contractors leave to somebody else. Asphalt cut tight to the new edge, compacted, joint sealed.
How far north do you go?
Do you do curb and gutter?
Why do dumpster pads fail so often?
How long before we can use new concrete?
Do you subcontract the concrete out?
The Lots and Surfaces in Spooner
Spooner is the top of the road for us, about an hour and a half north of Eau Claire on Highway 53, a city of about 2,500 that calls itself the Crossroads of the North because 53, 63, 70 and 253 all meet here. It's the largest city in Washburn County, though the county seat is Shell Lake.
The commercial lots here are the hospital, the schools, the downtown and the industrial sites off the highways. Spooner Health is on Chandler Drive. The school district has its elementary, middle and high schools all in the city, and the high school on Highway 70 is a 163,000 square foot building whose track hosts the Heart O' North conference championships. Downtown runs along Walnut Street and River Street, and the state's largest cool-water fish hatchery, on West Maple Street, brings visitors year-round.
The city's development districts hold a machine shop, a warehouse built for Frito-Lay, a 24,000 square foot office and manufacturing building and an auto dealer, and the city has bought another 27 acres between Highway 53 and Highway 63 for what comes next.
Where we work in Spooner
- Downtown Walnut Street
- South River Street
- Highway 70
- The Highway 53 and 63 junction
Around Spooner: Governor Thompson State Fish Hatchery on West Maple Street, Spooner Health on Chandler Drive, The rodeo grounds on West Beaverbrook Avenue, The Railroad Memories Museum in the old depot, Walnut Street.
2,494 people, 2024 Census estimate.
Spooner's average high stays below freezing from November through February and it gets about 51 inches of snow a year. Overnight lows only average above 50 in June, July and August, which is the sealing window.
Get a Free Estimate in Spooner
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on commercial lots and properties in Spooner
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in Spooner
- Sealcoating in Spooner
- Crack Filling and Sealing in Spooner
- Asphalt Repair and Patching in Spooner
- Catch Basin Repair in Spooner
- Parking Lot Striping in Spooner
- Track and Athletic Surfaces in Spooner
- Asphalt Paving in Spooner
Concrete in Nearby Towns
- Concrete in Rice Lake
- Concrete in Barron
- Concrete in New Richmond
- Concrete in Baldwin
- Concrete in Stillwater
- Concrete in Hudson
Everything about concrete, including how the work goes and what changes the price