Concrete in New Richmond

Concrete in New Richmond, Wisconsin.

Dumpster pads, dock aprons, curb and gutter for commercial properties in New Richmond. Poured at 4,500 PSI with tied rebar, and the asphalt around it tied back in.

4.7 from 21 Google reviews

About an hour and fifteen minutes northwest of Eau Claire on I-94 and Highway 64. The estimate is free.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
4.7 Google ratingFrom 21 reviews
4,500 PSI Exterior mixTied rebar where it carries trucks
3 days Back in serviceOn a dock apron we poured

Working in New Richmond

Dock aprons at the plant on West 3rd Street and in the business park, dumpster pads behind the West Richmond Way stores, curb and gutter around the hospital campus. A dumpster pad carries the front axle of a loaded refuse truck rather than the container, and that's what the slab gets sized for. Commercial pours go down at 4,500 PSI with tied rebar. Where a pad replaces asphalt that has been pushing and rutting, the asphalt around the new edge gets keyed back in.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in New Richmond

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in New Richmond

Base, forms, steel, pour, finish, and the asphalt tied back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt cut tight to the new edge, compacted, joint sealed.

Questions We Get in New Richmond

What New Richmond calls us about, answered straight.

More questions answered
How far is New Richmond from you?
About 69 miles, an hour and fifteen minutes, out I-94 and then north on Highway 64. For commercial lots we come. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Does pavement work go out as a formal bid for a school district?
Yes. You get a written scope with the quantities and a fixed number, in the form the district needs to put in front of a board. Quantities are what let a board compare one number against another, so the scope lists them area by area rather than as a lump.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

The Lots and Surfaces in New Richmond

New Richmond is a city of about 10,900 in St. Croix County, north of the interstate where Highway 64 running east and west meets Highway 65 running north and south through town as Knowles Avenue. It's 69 driving miles from Eau Claire, about an hour and fifteen, out I-94 and then north. Highway 64 is an expressway with at-grade intersections until 145th Street in the city and a two-lane surface road from there in, which is worth knowing if you're routing a truck. The Willow River runs through the city.

The industrial ground is one park, one big plant and an airport. The New Richmond Business and Technical Park runs about 107 acres off Highway 65 on the south side, inside a tax increment district, with water, sewer, electric, natural gas and telecom in, rail under two miles off and the airport three. Syntegon builds packaging machinery at 155 West 3rd Street, a plant that has been through two owners before this one and employs more than 270 people. New Richmond Regional Airport has 123 privately owned hangars, more than any other airport in Wisconsin, better than 275 based aircraft, a jet center and roughly 35,000 to 40,000 operations a year.

The retail and institutional lots are on the two highways. West Richmond Way carries a Walmart Supercenter with a walk-in clinic inside the building, and South Knowles Avenue carries Northwood Technical College's New Richmond campus. Westfields Hospital and Clinic is a full medical campus on Hospital Road with an emergency department, primary and specialty clinics, a pharmacy, inpatient care and maternity. The school district has three elementary schools, a middle school and a high school on East Richmond Way with about 1,100 students, and a 2024 referendum paid for additions, renovations and site work across three of those buildings.

Where we work in New Richmond

  • New Richmond Business and Technical Park
  • West Richmond Way
  • South Knowles Avenue
  • New Richmond Regional Airport

Around New Richmond: New Richmond Regional Airport, The Willow River through town, Mary Park on Mary Park Lake, Freedom Park, The New Richmond West Side Historic District.

10,879 people, 2024 Census estimate.

Wisconsin is split into five frost zones for WisDOT's frozen road declaration, which goes out once the ground has frozen at least 18 inches deep. That's the number that matters to a lot: how far down the frost gets, not how cold the air is.

Get a Free Estimate in New Richmond

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in New Richmond
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.