Track and Athletic Surfaces in Spooner
Track and Athletic Surfaces in Spooner, Wisconsin.
Track and court resurfacing for schools in and around Spooner, scheduled into the summer window.
About an hour and a half north of Eau Claire on Highway 53. The estimate is free.

Working in Spooner
Spooner High School on Highway 70 has the track that hosts the Spooner Invitational, the Heart O' North Conference championships and the middle-school invitationals. Track work is a summer-window job, and lanes and exchange zones get measured rather than eyeballed.
From our jobs
Job Photos
What makes track work different
The surface work is the same trade. Clean it, fill what has opened up, seal it, and it lasts. What's different is everything downstream of the paint gun. Lane lines are set from a measured stagger so that every lane runs the same distance. Exchange zones and acceleration zones have defined lengths and have to be marked in the right colors to be read at speed. Get the layout wrong and you have a facility that looks finished and can't host a meet, which is a problem nobody notices until the day it matters.
What Decides the Price in Spooner
These are ranges. Anything at this scale is walked and measured before it is quoted, because condition and layout move the number far more than square footage does.
Restripe only
Existing layout, surface sound
Measured on site
- Lanes, exchange and acceleration zones, numbers
- Layout taken from the existing measured stagger
Crack repair, seal and restripe
The usual maintenance cycle
Measured on site
- Hot crack filling, surface seal, full relay of lines
- The cycle most asphalt tracks want every few years
Courts
Tennis, basketball, pickleball
Measured on site
- Per court, depending on condition and color coating
- Multiple courts on one visit come down per court
Public bodies usually need a bid they can put against a budget line, often a season ahead. Ask in the fall for work the following summer and you'll get a better number and a better slot.
How the Work Goes in Spooner
Track work happens in the summer window between seasons.
Walk it, measure it, write it
Condition survey and a measured check of the existing layout before anything is quoted. If the stagger has drifted from an earlier restripe, that gets found now rather than after the paint is down.
Crack repair
Hot rubber at 400 degrees into anything that has opened up. On a track this matters more than on a lot, because a crack across a running lane is a trip hazard as well as a leak.
Clean and seal
The whole surface, edge to edge. This is the step that buys the years and it is the one that gets deferred, because a faded track still works.
Lay out the lines
Chalked from measurements, checked, then painted. Lanes, exchange and acceleration zones, start lines, and lane numbers.
Hand it back clean
Cured, swept, and ready for the season.
How far north do you go?
When can track work be done?
How often does an asphalt track need resealing?
Can you restripe a track without resurfacing it?
Do you do tennis, basketball and pickleball courts?
Can you put track and court work out as a formal bid?
The Lots and Surfaces in Spooner
Spooner is the top of the road for us, about an hour and a half north of Eau Claire on Highway 53, a city of about 2,500 that calls itself the Crossroads of the North because 53, 63, 70 and 253 all meet here. It's the largest city in Washburn County, though the county seat is Shell Lake.
The commercial lots here are the hospital, the schools, the downtown and the industrial sites off the highways. Spooner Health is on Chandler Drive. The school district has its elementary, middle and high schools all in the city, and the high school on Highway 70 is a 163,000 square foot building whose track hosts the Heart O' North conference championships. Downtown runs along Walnut Street and River Street, and the state's largest cool-water fish hatchery, on West Maple Street, brings visitors year-round.
The city's development districts hold a machine shop, a warehouse built for Frito-Lay, a 24,000 square foot office and manufacturing building and an auto dealer, and the city has bought another 27 acres between Highway 53 and Highway 63 for what comes next.
Where we work in Spooner
- Downtown Walnut Street
- South River Street
- Highway 70
- The Highway 53 and 63 junction
Around Spooner: Governor Thompson State Fish Hatchery on West Maple Street, Spooner Health on Chandler Drive, The rodeo grounds on West Beaverbrook Avenue, The Railroad Memories Museum in the old depot, Walnut Street.
2,494 people, 2024 Census estimate.
Spooner's average high stays below freezing from November through February and it gets about 51 inches of snow a year. Overnight lows only average above 50 in June, July and August, which is the sealing window.
Get a Free Estimate in Spooner
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on commercial lots and properties in Spooner
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in Spooner
- Sealcoating in Spooner
- Crack Filling and Sealing in Spooner
- Asphalt Repair and Patching in Spooner
- Catch Basin Repair in Spooner
- Parking Lot Striping in Spooner
- Concrete in Spooner
- Asphalt Paving in Spooner
Track and Athletic Surfaces in Nearby Towns
- Track and Athletic Surfaces in Rice Lake
- Track and Athletic Surfaces in Barron
- Track and Athletic Surfaces in New Richmond
- Track and Athletic Surfaces in Baldwin
- Track and Athletic Surfaces in Stillwater
- Track and Athletic Surfaces in Hudson
Everything about track and athletic surfaces, including how the work goes and what changes the price


