Eau Claire, WI · Northwestern Wisconsin Open now (715) 450-9897

Asphalt Paving in New Richmond

Asphalt Paving in New Richmond, Wisconsin.

Lot paving, overlays and tear-out-and-replace for commercial properties in New Richmond. Base graded, compacted and drained before any mix goes down.

4.7 from 21 Google reviews

About an hour and fifteen minutes northwest of Eau Claire on I-94 and Highway 64. The estimate is free.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
4.7 Google ratingFrom 21 reviews
6-12 mo Before first sealNew asphalt has to cure
15-20 yrs Well-built drivewayIf it gets sealed

Working in New Richmond

The business and technical park is about 107 acres off Highway 65 with the utilities already in, rail under two miles away and the airport three, which is the kind of site where the lot goes in at the same time as the building. New pavement goes down on a graded, compacted, drained base, because once the surface is on, the base is the part nobody can look at again. On an existing lot the question is whether that base is still sound, and that's what settles overlay against tear-out. The district's referendum work included site improvements across three schools, which is the other place new asphalt has been going in.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in New Richmond

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in New Richmond

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in New Richmond

What New Richmond calls us about, answered straight.

More questions answered
How far is New Richmond from you?
About 69 miles, an hour and fifteen minutes, out I-94 and then north on Highway 64. For commercial lots we come. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Does pavement work go out as a formal bid for a school district?
Yes. You get a written scope with the quantities and a fixed number, in the form the district needs to put in front of a board. Quantities are what let a board compare one number against another, so the scope lists them area by area rather than as a lump.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

The Lots and Surfaces in New Richmond

New Richmond is a city of about 10,900 in St. Croix County, north of the interstate where Highway 64 running east and west meets Highway 65 running north and south through town as Knowles Avenue. It's 69 driving miles from Eau Claire, about an hour and fifteen, out I-94 and then north. Highway 64 is an expressway with at-grade intersections until 145th Street in the city and a two-lane surface road from there in, which is worth knowing if you're routing a truck. The Willow River runs through the city.

The industrial ground is one park, one big plant and an airport. The New Richmond Business and Technical Park runs about 107 acres off Highway 65 on the south side, inside a tax increment district, with water, sewer, electric, natural gas and telecom in, rail under two miles off and the airport three. Syntegon builds packaging machinery at 155 West 3rd Street, a plant that has been through two owners before this one and employs more than 270 people. New Richmond Regional Airport has 123 privately owned hangars, more than any other airport in Wisconsin, better than 275 based aircraft, a jet center and roughly 35,000 to 40,000 operations a year.

The retail and institutional lots are on the two highways. West Richmond Way carries a Walmart Supercenter with a walk-in clinic inside the building, and South Knowles Avenue carries Northwood Technical College's New Richmond campus. Westfields Hospital and Clinic is a full medical campus on Hospital Road with an emergency department, primary and specialty clinics, a pharmacy, inpatient care and maternity. The school district has three elementary schools, a middle school and a high school on East Richmond Way with about 1,100 students, and a 2024 referendum paid for additions, renovations and site work across three of those buildings.

Where we work in New Richmond

  • New Richmond Business and Technical Park
  • West Richmond Way
  • South Knowles Avenue
  • New Richmond Regional Airport

Around New Richmond: New Richmond Regional Airport, The Willow River through town, Mary Park on Mary Park Lake, Freedom Park, The New Richmond West Side Historic District.

10,879 people, 2024 Census estimate.

Wisconsin is split into five frost zones for WisDOT's frozen road declaration, which goes out once the ground has frozen at least 18 inches deep. That's the number that matters to a lot: how far down the frost gets, not how cold the air is.

Get a Free Estimate in New Richmond

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in New Richmond
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?