Track and Athletic Surfaces in New Richmond
Track and Athletic Surfaces in New Richmond, Wisconsin.
Track and court resurfacing for schools in and around New Richmond, scheduled into the summer window.
About an hour and fifteen minutes northwest of Eau Claire on I-94 and Highway 64. The estimate is free.

Working in New Richmond
New Richmond High School is on East Richmond Way with about 1,100 students, and it runs varsity track and field and varsity tennis. The district has three elementary schools and a middle school besides, and its 2024 referendum covered additions, renovations and site improvements at Starr Elementary, Paperjack Elementary and the middle school. Track and court surfaces are summer work. Track work gets laid out to the measurements rather than by eye, because lanes and exchange zones have to come out where they're supposed to.
From our jobs
Job Photos
What makes track work different
The surface work is the same trade. Clean it, fill what has opened up, seal it, and it lasts. What's different is everything downstream of the paint gun. Lane lines are set from a measured stagger so that every lane runs the same distance. Exchange zones and acceleration zones have defined lengths and have to be marked in the right colors to be read at speed. Get the layout wrong and you have a facility that looks finished and can't host a meet, which is a problem nobody notices until the day it matters.
What Decides the Price in New Richmond
These are ranges. Anything at this scale is walked and measured before it is quoted, because condition and layout move the number far more than square footage does.
Restripe only
Existing layout, surface sound
Measured on site
- Lanes, exchange and acceleration zones, numbers
- Layout taken from the existing measured stagger
Crack repair, seal and restripe
The usual maintenance cycle
Measured on site
- Hot crack filling, surface seal, full relay of lines
- The cycle most asphalt tracks want every few years
Courts
Tennis, basketball, pickleball
Measured on site
- Per court, depending on condition and color coating
- Multiple courts on one visit come down per court
Public bodies usually need a bid they can put against a budget line, often a season ahead. Ask in the fall for work the following summer and you'll get a better number and a better slot.
How the Work Goes in New Richmond
Track work happens in the summer window between seasons.
Walk it, measure it, write it
Condition survey and a measured check of the existing layout before anything is quoted. If the stagger has drifted from an earlier restripe, that gets found now rather than after the paint is down.
Crack repair
Hot rubber at 400 degrees into anything that has opened up. On a track this matters more than on a lot, because a crack across a running lane is a trip hazard as well as a leak.
Clean and seal
The whole surface, edge to edge. This is the step that buys the years and it is the one that gets deferred, because a faded track still works.
Lay out the lines
Chalked from measurements, checked, then painted. Lanes, exchange and acceleration zones, start lines, and lane numbers.
Hand it back clean
Cured, swept, and ready for the season.
Questions We Get in New Richmond
What New Richmond calls us about, answered straight.
More questions answeredHow far is New Richmond from you?
Does pavement work go out as a formal bid for a school district?
When can track work be done?
How often does an asphalt track need resealing?
Can you restripe a track without resurfacing it?
Do you do tennis, basketball and pickleball courts?
Can you put track and court work out as a formal bid?
The Lots and Surfaces in New Richmond
New Richmond is a city of about 10,900 in St. Croix County, north of the interstate where Highway 64 running east and west meets Highway 65 running north and south through town as Knowles Avenue. It's 69 driving miles from Eau Claire, about an hour and fifteen, out I-94 and then north. Highway 64 is an expressway with at-grade intersections until 145th Street in the city and a two-lane surface road from there in, which is worth knowing if you're routing a truck. The Willow River runs through the city.
The industrial ground is one park, one big plant and an airport. The New Richmond Business and Technical Park runs about 107 acres off Highway 65 on the south side, inside a tax increment district, with water, sewer, electric, natural gas and telecom in, rail under two miles off and the airport three. Syntegon builds packaging machinery at 155 West 3rd Street, a plant that has been through two owners before this one and employs more than 270 people. New Richmond Regional Airport has 123 privately owned hangars, more than any other airport in Wisconsin, better than 275 based aircraft, a jet center and roughly 35,000 to 40,000 operations a year.
The retail and institutional lots are on the two highways. West Richmond Way carries a Walmart Supercenter with a walk-in clinic inside the building, and South Knowles Avenue carries Northwood Technical College's New Richmond campus. Westfields Hospital and Clinic is a full medical campus on Hospital Road with an emergency department, primary and specialty clinics, a pharmacy, inpatient care and maternity. The school district has three elementary schools, a middle school and a high school on East Richmond Way with about 1,100 students, and a 2024 referendum paid for additions, renovations and site work across three of those buildings.
Where we work in New Richmond
- New Richmond Business and Technical Park
- West Richmond Way
- South Knowles Avenue
- New Richmond Regional Airport
Around New Richmond: New Richmond Regional Airport, The Willow River through town, Mary Park on Mary Park Lake, Freedom Park, The New Richmond West Side Historic District.
10,879 people, 2024 Census estimate.
Wisconsin is split into five frost zones for WisDOT's frozen road declaration, which goes out once the ground has frozen at least 18 inches deep. That's the number that matters to a lot: how far down the frost gets, not how cold the air is.
Get a Free Estimate in New Richmond
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on commercial lots and properties in New Richmond
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in New Richmond
- Sealcoating in New Richmond
- Crack Filling and Sealing in New Richmond
- Asphalt Repair and Patching in New Richmond
- Catch Basin Repair in New Richmond
- Parking Lot Striping in New Richmond
- Concrete in New Richmond
- Asphalt Paving in New Richmond
Track and Athletic Surfaces in Nearby Towns
- Track and Athletic Surfaces in Baldwin
- Track and Athletic Surfaces in Hudson
- Track and Athletic Surfaces in Stillwater
- Track and Athletic Surfaces in River Falls
- Track and Athletic Surfaces in Lake Elmo
- Track and Athletic Surfaces in Oakdale
Everything about track and athletic surfaces, including how the work goes and what changes the price


