Concrete Repair in New Richmond
Concrete Repair in New Richmond, Wisconsin.
Concrete repair for commercial property in New Richmond. A lifted walk panel at the entrance, a curb face the plow took off, an approach broken up where the trucks come in. Cut out at the joints and poured back flush.
About an hour and fifteen minutes northwest of Eau Claire on I-94 and Highway 64. The estimate is free.

Working in New Richmond
Wisconsin's sidewalk statute runs in New Richmond the same as anywhere else in the state, so the city can order a walk that is unsafe, defective or insufficient replaced, serve the owner notice, and after 20 days do the work at the owner's expense and put it on the tax roll as a special charge. Ordinance 70-8 puts sidewalk snow and ice on the owner for the full width of the walk within 24 hours of the snow stopping, and the Street Superintendent clears what is left and assesses the cost. The city and WisDOT are rebuilding East 1st Street from South Knowles Avenue to Greaton Road, about 3,150 feet of urban corridor with new curb and gutter, storm sewer and sidewalk, with the design year in 2026. Public frontage in New Richmond runs along West Richmond Way at the Walmart and the business and technical park, up South Knowles Avenue past the Northwood Technical College campus, and out to Westfields Hospital on Hospital Road.
How concrete fails in a Wisconsin winter
Four things take concrete apart here, and each one goes after a different part of a property. A sidewalk panel sits on saturated ground or over a root. The water under it freezes, expands and lifts the panel. In spring the ground thaws and settles, and the panel does not go all the way back down with it, so what was flush in October is a lip in April. Then a plow blade catches that lip every storm for five months and breaks the leading edge off it. A curb takes the plow head on. The blade rides up the gutter, catches the curb face and takes the nose off in chunks. Salted slush sits in the gutter longer than anywhere else on the lot, because the gutter is where everything on the lot drains to, so the gutter is where the surface scales first. De-icer does the same thing to flat concrete. Chloride pulls water into the surface and runs more freeze and thaw cycles through it in a season than the weather would on its own. The mortar skin comes off in flakes and the aggregate stands proud. The approach at the street is a joint between two slabs that belong to different people. The street sits on a road section and a deep base; the drive sits on whatever was there. Frost gets under the shallower one first, the apron cracks along the gutter line, and that crack takes water into the base under both of them.
What Decides the Price in New Richmond
Concrete repair is measured in a different unit for every part of a property, so the bands below are the units this work is priced in rather than sizes of job. What sets the number in each one is how much has to come out and what is found under it.
Sidewalk panels and entrance walks
Per panel
Measured on site
- Whole panels cut at the existing joints, not a piece out of the middle
- Poured back flush with the panels on either side of it
Curb and gutter
Per linear foot
Measured on site
- Broken curb face and gutter replaced in sections
- Radius work formed to the island instead of run straight
Driveway approaches and entrance aprons
Per approach
Measured on site
- The apron from the lot or the drive out to the gutter line
- Concrete where the street already has curb and gutter
Pads and slabs
Per section
Measured on site
- One failed section out at its joints, the sound concrete around it left alone
- The base under it repaired before anything goes back
Catch basin collars
Per structure
Measured on site
- The concrete ring around a storm grate, poured back to grade
- Sized to spread the load off the structure and onto the subgrade
What moves it: how many panels or feet come out, how deep the base repair goes under them, whether the section carries vehicles or only feet, what a concrete truck can reach, and how much asphalt has to be tied back in at the edge. Breaking the old concrete out and hauling it away is its own line on the estimate.
How We Do Concrete Repair in New Richmond
Saw cut, removal, base repair, forms and steel, the pour, and the joint at the edge.
Walk it and mark what comes out
Concrete moves at its joints, so the repair is decided in whole panels and whole sections. We mark what has failed and what the failed piece is sitting on, and you see the line before anything gets cut.
Saw cut at the joints
A clean vertical cut on an existing joint, full depth. Breaking concrete out on a ragged line leaves the next slab with no edge to bear against, which is where the repair opens up first.
Break it out and haul it away
The old concrete comes out full depth and goes on the truck. What is under it is usually the reason it failed, and it is not visible until then.
Repair and compact the base
Wet or washed-out material taken out, replaced and compacted. Concrete poured on soft ground cracks on a schedule set by the ground rather than by the concrete, and a panel replaced without touching the base lifts again.
Form against what stays
Formed to grade so water runs where it ran before, and poured tight against the concrete on either side. Radius forms on curb work, rebar tied in where it carries vehicles.
Pour, finish and seal the joint
Placed, screeded, floated and broom finished to match what it sits against. Where the repair meets asphalt, the asphalt gets cut tight to the new edge, compacted, and the joint sealed.
Questions We Get in New Richmond
What New Richmond calls us about, answered straight.
More questions answeredHow far is New Richmond from you?
Does pavement work go out as a formal bid for a school district?
What counts as a trip hazard on a sidewalk?
Who is responsible for the sidewalk in front of a building?
Can a lifted sidewalk panel be leveled instead of replaced?
The plow broke the curb nose. Does the whole curb line have to come out?
Do we need a permit for the approach at the street?
How long before new concrete takes traffic?
The Lots and Surfaces in New Richmond
New Richmond is a city of about 10,900 in St. Croix County, north of the interstate where Highway 64 running east and west meets Highway 65 running north and south through town as Knowles Avenue. It's 69 driving miles from Eau Claire, about an hour and fifteen, out I-94 and then north. Highway 64 is an expressway with at-grade intersections until 145th Street in the city and a two-lane surface road from there in, which is worth knowing if you're routing a truck. The Willow River runs through the city.
The industrial ground is one park, one big plant and an airport. The New Richmond Business and Technical Park runs about 107 acres off Highway 65 on the south side, inside a tax increment district, with water, sewer, electric, natural gas and telecom in, rail under two miles off and the airport three. Syntegon builds packaging machinery at 155 West 3rd Street, a plant that has been through two owners before this one and employs more than 270 people. New Richmond Regional Airport has 123 privately owned hangars, more than any other airport in Wisconsin, better than 275 based aircraft, a jet center and roughly 35,000 to 40,000 operations a year.
The retail and institutional lots are on the two highways. West Richmond Way carries a Walmart Supercenter with a walk-in clinic inside the building, and South Knowles Avenue carries Northwood Technical College's New Richmond campus. Westfields Hospital and Clinic is a full medical campus on Hospital Road with an emergency department, primary and specialty clinics, a pharmacy, inpatient care and maternity. The school district has three elementary schools, a middle school and a high school on East Richmond Way with about 1,100 students, and a 2024 referendum paid for additions, renovations and site work across three of those buildings.
Where we work in New Richmond
- New Richmond Business and Technical Park
- West Richmond Way
- South Knowles Avenue
- New Richmond Regional Airport
Around New Richmond: New Richmond Regional Airport, The Willow River through town, Mary Park on Mary Park Lake, Freedom Park, The New Richmond West Side Historic District.
10,879 people, 2024 Census estimate.
Wisconsin is split into five frost zones for WisDOT's frozen road declaration, which goes out once the ground has frozen at least 18 inches deep. That's the number that matters to a lot: how far down the frost gets, not how cold the air is.
Get a Free Estimate in New Richmond
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on commercial lots and properties in New Richmond
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in New Richmond
- Sealcoating in New Richmond
- Crack Filling and Sealing in New Richmond
- Asphalt Repair and Patching in New Richmond
- Catch Basin Repair in New Richmond
- Parking Lot Striping in New Richmond
- Track and Athletic Surfaces in New Richmond
- Concrete in New Richmond
- Asphalt Paving in New Richmond
Concrete Repair in Nearby Towns
- Concrete Repair in Baldwin
- Concrete Repair in Hudson
- Concrete Repair in Stillwater
- Concrete Repair in River Falls
- Concrete Repair in Lake Elmo
- Concrete Repair in Oakdale
Everything about concrete repair, including how the work goes and what changes the price