Each of these has a page written about River Falls specifically.
The sealable pavement here is the campus, the hospital on East Division Street and the corporate parks northwest of town. A campus gets measured area by area, because a student lot, a staff lot and a service drive are in different shape and carry different traffic, and one number over a whole property hides which areas actually need the work. A management spec written in the Twin Cities often carries a no-coal-tar line, because Minnesota banned the sale and use of coal tar sealer statewide in 2014; Wisconsin has no statewide ban and neither River Falls nor either of its counties has passed one. We run an asphalt emulsion, so that spec line reads the same here as it does across the river.
Crack Filling and Sealing
The Pierce County soil survey puts the biggest areas of sandy outwash in the valley of the Kinnickinnic, with silt loam terraces along the river, and sand and silt don't behave the same way when they freeze. A crack left open takes water into whichever of the two is under it. Wide cracks get routed to a clean face and hot rubber goes in at 400 degrees, thin enough at that temperature to reach the bottom and bond to the walls. Cold pour never gets that far down.
Asphalt Repair and Patching
The corporate parks northwest of town take the truck traffic, and the Radio Road interchange put them straight onto Highway 35, so freight reaches them without coming through the city. Whitetail Ridge alone has around a dozen businesses and an estimated 400 employees on it. Where a lot has failed in a driving lane it's the base that's gone, and a patch laid over it comes back in the same spot the following spring. That area gets cut back square to sound asphalt, dug out to something firm, rebuilt and compacted, then hot mix rolled in flush with what's around it.
Mann Valley was built from scratch, with two and a half miles of sanitary sewer, four and a half miles of water main and 3,900 feet of roadway put in before anything went up on it, so what's underground out there is new. Downtown and around the older industrial park it isn't. A structure that has been moving for twenty years takes the asphalt around it down a little more every winter, and what you see is the ring of broken pavement rather than anything wrong with the grate. A rebuild means the structure, a new collar and the asphalt keyed back in at the right pitch.
A campus that size carries more layout than a single lot does: ADA stalls and access aisles at the federal dimensions, fire lanes, and drive aisles that work for a service truck as well as a car. The hospital lot on East Division Street is the other public one, where the route from an accessible stall to the door is the part that matters. Out in the corporate parks it's dock and trailer layout more than stalls. Paint goes down on chalked lines after the sealer has cured, not on top of a fresh seal.
Track and Athletic Surfaces
UW-River Falls has the track. David Smith Stadium at Ramer Field is a nine-lane 400-meter outdoor track with pole vault, long and triple jump runways and throwing venues around an AstroTurf field, and Ramer Tennis Courts sit just east of it with six outdoor hard courts. Inside, the Knowles Field House has a six-lane 200-meter competition track and five tennis and volleyball courts. River Falls High School on Cemetery Road runs boys' and girls' track and field and tennis, and the district's 2024 referendum covered grounds work and multipurpose athletic space. Track work gets laid out to the measurements rather than by eye, because lanes and exchange zones have to come out where they're supposed to.
Dock aprons and pads in the four parks, curb and gutter along the new roadway in Mann Valley, dumpster pads behind the downtown businesses and the campus buildings. Where a trailer's landing gear comes down in the same square yard every day, concrete goes in and asphalt doesn't last. Commercial pours are 4,500 PSI with tied rebar, and the asphalt around the edge gets keyed back in.
Mann Valley is more than 200 acres of new ground with one 155-acre lot in it, and the buildout put in 3,900 feet of roadway before anything was built on it. Sterling Ponds has four lots over 15 acres, Whitetail Ridge has two over 12.5, and the industrial park has a three-acre lot left. A lot on ground that's just been graded and filled needs the base compacted and drained before any asphalt goes on it, because that's the part nobody can look at once it's paved. On an existing lot the choice is overlay or tear-out, and it comes down to whether the base under it is still sound.