Eau Claire, WI · Northwestern Wisconsin Open now (715) 450-9897

Commercial · I-94 West to the Twin Cities

Commercial Pavement Maintenance in Cottage Grove, Minnesota

Parking lot sealcoating, crack filling, patching, catch basin repair, striping, concrete pads and aprons, and lot paving for commercial properties in Cottage Grove. About an hour and a half west of Eau Claire on I-94 and south on Highway 61, and the estimate is free.

42,760people
I-94 West to the Twin Citiesthe road out of Eau Claire
Lots onlyno driveways, no plowing

The Lots and Surfaces in Cottage Grove

Cottage Grove is in Washington County, about 43,000 people, served by US 61, US 10 and I-494. From Eau Claire it's about 84 miles and roughly an hour and a half, west on I-94 and then south on 61. The city puts its business park 11 miles off I-94 and a bit over six miles from I-494.

This is the industrial end of the corridor. The Cottage Grove Business Park is off Highway 61 at the Jamaica exit, four-lane frontage, lots divisible down to an acre and rail-served sites on the CP line, and the city's own list of firms out there runs from Airgas and United Rentals to Renewal by Andersen, Tradehome Shoes, the USPS and Up North Plastics. Werner Electric's headquarters and regional distribution center is on 95th Street South, a 122,000 square foot building on 20 acres that has since been expanded. 3M has run chemical operations here since 1947.

The newest ground is bigger still. Cottage Grove Logistics Park is a 253-acre site with nine industrial buildings planned, about 3.4 million square feet, with direct access to Highway 61, I-494 and I-94. Innovation Village is another 223 acres along 61, opened up by the 100th Street extension and a bridge over the CPKC railroad and aimed at logistics and distribution. The retail corridor is East Point Douglas Road South, with Cottage Grove Plaza and Gateway Center on it and a Walmart built on part of the old drive-in site; the rest of that ground is 73 developable commercial acres at Innovation Road. Three clinics serve the city, and the public campus is City Hall and public safety on Ravine Parkway with the HERO Center training campus and range next to it.

Where the lots are in Cottage Grove

  • Cottage Grove Business Park
  • Cottage Grove Logistics Park
  • Innovation Village
  • East Point Douglas Road South
  • Ravine Parkway South

Around Cottage Grove: Ravine Regional Park, The HERO Center on 85th Street South, Park Grove Library on Hemingway Avenue, River Oaks municipal golf course, Cottage Grove Plaza on East Point Douglas Road.

42,760 people, 2024 Census estimate.

The Mississippi valley outwash runs through here, sand and gravel that filled the valley and was later cut into flat terraces between 800 and 820 feet, and the valley widens near Cottage Grove. State building rules put the frost footing depth at 42 inches in Washington County.

What We Do in Cottage Grove

Each of these has a page written about Cottage Grove specifically.

Sealcoating

Minnesota's ban covers the sale as well as the use, so since 2014 nothing sold in the state for asphalt pavement is a coal tar sealer. We run an asphalt emulsion, Pitch Black. Sealcoating here is mostly the retail and clinic lots along East Point Douglas Road and the office side of the business park, because a truck court is a different question from a customer lot. Sealer protects the top of the asphalt, so anything failing underneath gets handled first.

Crack Filling and Sealing

The ground under Cottage Grove is Mississippi valley outwash, sand and gravel cut into flat terraces, and Minnesota's building rules set the frost footing depth at 42 inches in Washington County. On a truck lot the cracks that matter are in the wheel paths and at the dock approach, because that's where the load is and where the water gets pushed in. Wide cracks get routed to a clean face and hot rubber goes in at 400 degrees, so it grips the walls and moves with them. Cold pour on a lot that sees trailers lifts out in strips.

Asphalt Repair and Patching

There's a 253-acre logistics park here with about 3.4 million square feet of industrial building planned on it, a distribution center on 95th Street and the business park's rail-served sites. Truck-court pavement fails at the base rather than at the surface, because a loaded trailer parks, turns and lands its gear in the same square yard every day. So the repair goes saw-cut back to sound asphalt, the soft material dug out, the base rebuilt and compacted in lifts, hot mix rolled in flush and the perimeter joint sealed. Patching the top of a soft base on a truck lot buys a season at most.

Catch Basin Repair

The whole city sits inside the South Washington Watershed District, which reviews site plans against its own rules, last updated in 2022, and holds the city to the MS4 permit's nondegradation requirement. That puts the structures in a private lot inside a system somebody else has standards for. A basin whose frame has dropped takes the asphalt around it down a little further every winter, and an overlay just follows the failing grade back down. Rebuilt means the structure reset to grade, a new collar, and the asphalt saw-cut back and keyed in at the right pitch.

Parking Lot Striping

There are two kinds of lot here and they don't stripe alike. On East Point Douglas Road it's retail: ADA stalls and access aisles at the federal dimensions, fire lanes, and the crossings from the stalls to the doors. In the business park and the logistics park it's trailer stalls, truck routes and dock approaches, where the drive aisle feeding a row decides whether the row works at all. The public lots are the city's own campus on Ravine Parkway and the HERO Center on 85th Street. A trailer layout gets set out and chalked before any paint goes down.

Track and Athletic Surfaces

Park High School on 80th Street South is the South Washington County high school here, and it has an outdoor track that shows up as a meet venue plus tennis courts on site. The district runs about 19,360 students across 29 schools, so the buildings-and-grounds list it works through is long. Track and court work is a summer job, and the summer window is the one every district in the metro is trying to book. Lanes and exchange zones get measured rather than eyeballed, and anything that has opened up gets hot rubber at 400 degrees before a surface goes over it.

Concrete

Dock aprons and trailer pads are the concrete work here, and they're where an industrial property's pavement is decided. Where a trailer's landing gear sets down, or where a truck's front axle stops at a compactor, that point load is what tears asphalt apart in a couple of seasons, so it gets poured instead. Commercial pours go down at 4,500 PSI with tied rebar. The asphalt around the pour gets tied back in as part of the same work.

Asphalt Paving

The logistics park is 253 acres and nine buildings, about 3.4 million square feet, with direct access to Highway 61, I-494 and I-94, and Innovation Village is another 223 acres opened up along 61. There are 73 developable commercial acres left at Innovation Road as well. Pavement for that kind of use goes down on a base graded, compacted and drained to suit what will drive on it, because a lot built for cars and then used by trailers is a lot that fails early. New asphalt still waits six to twelve months for its first seal.

Questions From Cottage Grove

What property owners and managers here ask, answered.

More about commercial work
How far out is this for you?
Cottage Grove is about 84 miles from Eau Claire and roughly an hour and a half: I-94 west, then south on Highway 61. For commercial lots we come out. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Our dock approach is coming apart. Is that an asphalt fix or a concrete one?
Where a trailer sets down and its landing gear lands in the same spot every day, concrete is the right material and asphalt isn't, and that's a pour rather than a patch. Where the failure is out in the truck court instead, it's asphalt: saw-cut back to sound material, the base dug out and rebuilt. Which one you have gets settled by walking it.
Our lot was laid out for cars and we've started taking trailers. Can it be restriped for that?
Yes, and it's measured layout work rather than a repaint. A trailer needs the turn as much as the stall length, so the drive aisle feeding a row decides whether the row works at all. If the count you're after won't fit the lot you have, we'll tell you that before any paint goes down.

Get a Free Estimate in Cottage Grove

Tell us about the property and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Cottage Grove
  • A photo of the lot helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?