Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Cameron

Concrete in Cameron, Wisconsin.

Concrete flatwork, aprons and curb in Cameron. Commercial pours go down at 4,500 PSI with tied rebar, priced and scheduled with the asphalt.

4.7 from 18 Google reviews

About 50 minutes north of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
1,851 People in Cameron
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Cameron
400°F Crack fillerDirect-fire rubber

What a Concrete Job Looks Like in Cameron

Highway commercial is what Cameron has, strung along the two US routes rather than concentrated in a downtown block. That means larger lots with their own access and room to work, unlike a shared alley downtown.

It also means heavier vehicles than a village this size would otherwise see. Traffic that's passing through rather than stopping still turns, brakes and parks, and highway-frontage surface wears at the entrances first for that reason. If a lot here is failing, the aprons are usually where it started.

Concrete specifically in Cameron

Aprons and pads where turning traffic concentrates. On a highway entrance, concrete at the apron and asphalt beyond it's often the right split rather than one material throughout.

The Driveways and Lots in Cameron

Cameron sits in Barron County where US Highway 8 meets US Highway 53, which is the reason to know it. Highway 8 is the main east-west route across northern Wisconsin and 53 is the north-south spine, so a village of 1,872 sits on a genuine crossroads and carries the traffic that goes with one.

Cameron is younger than the towns around it. Only about a quarter of its housing predates 1960 and roughly a fifth has been built since 2000, which is the opposite of the pattern in most of the north end of the area. It is not the newest place we work; Lake Hallie and Altoona both have a larger share built since 2000. It is the newest thing this far north, which is what matters if you live here.

For a driveway that's good news with one catch. A drive from the 2000s is very likely worth maintaining and very likely still has a sound base under it. But a twenty-year-old drive that has never been sealed is right at the point where neglect starts costing real money, and a lot of Cameron is exactly that age.

Cameron

We work the whole village rather than a named handful of neighborhoods.

Around Cameron: US 8 and US 53 junction, Cameron schools, Hay River.

The far north of what we cover, so both ends of the season close in earlier than they do in Eau Claire. Standard 48-inch frost depth.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Cameron

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Cameron

Base, forms, steel, pour, finish, and the asphalt keyed back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt keyed to the new edge, compacted, joint sealed.

Questions We Get in Cameron

What Cameron calls us about, answered straight.

More questions answered
Is Cameron too far north for you to come up?
No, and it is fair to ask, because at about fifty minutes it is the furthest town north we hold a page for. We come up here. What is worth doing at this distance is asking before the season rather than in the middle of it, and saying so if a neighbor wants theirs done the same week. The estimate is free, and the number you approve is the number you pay.
Does the shorter season up here change when work gets done?
It closes both ends rather than the middle. This is the far north of what we cover, so spring opens later and fall shuts sooner than it does down the valley. In practice that means fall crack filling here wants booking earlier than it would in Eau Claire, and a late-September sealing date is tighter than the calendar makes it look.
How much does a concrete driveway cost?
Thickness, reinforcement and access are what move it. A slab that has to carry vehicles is thicker than one that carries feet, steel adds cost and adds life, and a pour a truck cannot reach has to be barrowed, which is labour. Removing the old surface is quoted separately rather than hidden in the rate, so you can see what each part costs.
Concrete or asphalt for a driveway?
Concrete costs roughly two to three times as much up front and lasts longer with less maintenance. Asphalt is cheaper, goes down faster, handles frost movement better, and needs sealing every two to three years. Which one suits comes down to the loading, the frost and the budget.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

Get a Free Estimate in Cameron

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.