Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Elk Mound

Concrete in Elk Mound, Wisconsin.

Concrete flatwork, aprons and curb in Elk Mound. Commercial pours go down at 4,500 PSI with tied rebar, priced and scheduled with the asphalt.

4.7 from 18 Google reviews

About 15 minutes west of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
2,048 People in Elk Mound
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Elk Mound
400°F Crack fillerDirect-fire rubber

What a Concrete Job Looks Like in Elk Mound

The dominant paved surface in Elk Mound isn't commercial in the usual sense. Three school buildings sit within a few hundred feet of each other on University Street, and their combined enrollment is larger than the village population, because the district draws from well beyond the village limits.

That produces a specific kind of surface: bus loops, drop-off lanes, staff and visitor lots, all of it loaded twice a day for nine months and largely empty for three. Bus loading is heavier than car parking and it repeats on exactly the same wheel path, which is why school lots rut where ordinary lots crack. And the work has to happen in the summer window or it doesn't happen.

Concrete specifically in Elk Mound

Bus pads and approach aprons, where repeated heavy loading on the same spot outruns what asphalt will hold. Residential concrete is mostly garage aprons on the 1990s stock.

The Driveways and Lots in Elk Mound

Elk Mound sits in Dunn County between Eau Claire, Menomonie and Chippewa Falls, named for the mound that rises above it. At about fifteen minutes from the shop it's one of the closest towns to the shop, which matters for what a small job costs to get to.

Elk Mound is one of the newest-built towns in the service area. The 1990s are its largest decade, only about a fifth of the housing predates 1950, and barely half predates 1980.

A 1990s driveway is now thirty years old, which is the age where the difference between maintained and neglected becomes stark. Sealed on a cycle, it has years left. Never touched, it has spent three decades oxidizing and the surface stone is usually loose underfoot. Both are common here, on the same streets.

Elk Mound

We work the whole village rather than a named handful of neighborhoods.

Around Elk Mound: Elk Mound, University Street school campus, the mound tower.

Standard 48-inch frost depth and the same season as Eau Claire, which is close enough that scheduling here's straightforward.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Elk Mound

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Elk Mound

Base, forms, steel, pour, finish, and the asphalt keyed back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt keyed to the new edge, compacted, joint sealed.

Questions We Get in Elk Mound

What Elk Mound calls us about, answered straight.

More questions answered
Can school lot work be done without disrupting the year?
It has to be, which means it gets quoted in winter and done in the summer break. Sealing needs a clear, dry surface for about a day per section, and bus loops in particular can't be half-done on a school morning. Booked ahead it's straightforward. Booked in August it usually isn't.
Under half the homes here are single-family. Does that change the work?
It means a real share of what looks residential is shared surface: duplexes, small multi-unit buildings and the parking that goes with them. Those carry more vehicles than one drive does and they wear at the entrance and the aisle rather than in the middle. They get quoted like a small lot, with the bid saying plainly which areas are included, because that is the document everybody sharing the cost has to agree on.
How much does a concrete driveway cost?
Thickness, reinforcement and access are what move it. A slab that has to carry vehicles is thicker than one that carries feet, steel adds cost and adds life, and a pour a truck cannot reach has to be barrowed, which is labour. Removing the old surface is quoted separately rather than hidden in the rate, so you can see what each part costs.
Concrete or asphalt for a driveway?
Concrete costs roughly two to three times as much up front and lasts longer with less maintenance. Asphalt is cheaper, goes down faster, handles frost movement better, and needs sealing every two to three years. Which one suits comes down to the loading, the frost and the budget.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

Get a Free Estimate in Elk Mound

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.