Each of these has a page written about Rice Lake specifically.
The lots that need sealing here are the big ones: South Main Street retail from Cedar Mall down, the hospital campus on West Stout, the two campuses on College Drive, the plants in the business parks. A lot that size gets measured rather than estimated by eye, and the number is fixed before we start. There's no coal tar ban in Barron County, and we run an asphalt emulsion regardless.
Crack Filling and Sealing
The state's geotechnical manual describes the ground up here as silty glacial till with outwash sand and organic pockets through it, and ground like that moves with the frost. A crack on a lot that sits on it gets wider every winter until it's filled. Wide ones get routed first, and the rubber goes in at 400 degrees so it bonds to the walls instead of lifting out in the spring.
Asphalt Repair and Patching
The lots that see trucks are the ones to watch: the business parks on the north side, Menards on Decker Drive, the loading sides of the plants. A pothole in a truck lane is a base problem before it's a surface problem, so the repair is cut back to sound asphalt and the base rebuilt and compacted, not a skim over the top.
The South Main Street retail lots and the parks on the north side are the ones with storm structures in them. A basin whose frame has dropped takes the asphalt around it down a little more every year, and the asphalt is what you notice, long after the structure underneath started moving. Rebuilt properly means the structure, a new collar and the asphalt keyed back in at the right pitch.
Cedar Mall, the South Main Street pads, the hospital and the two campuses are lots where the layout is the job: ADA stalls and access aisles to the federal dimensions, fire lanes, drive aisles a delivery truck can actually use. A restripe on a sealed lot goes on after the sealer cures.
Track and Athletic Surfaces
Rice Lake High School runs track and field and girls' tennis, and the district has three elementary schools, a middle school and the high school. Track and court work anywhere is a summer-window job, and the window is the same one every other district is booking.
Dumpster pads behind the South Main Street restaurants, dock aprons in the business parks, curb and gutter around the hospital campus. A pad is poured for the front axle of a loaded refuse truck rather than for the container, and commercial pours go down at 4,500 PSI with tied rebar.
Rice Lake Business Park has 167 acres with the streets and utilities already in, CedarSide has 44 next to Northwood Tech, and Allram Lumber is building in the North Industrial Park now. A new lot in a park goes down on a graded, compacted, drained base or not at all, because a lot laid over whatever was there is the one that fails early.