Eau Claire, WI · Northwestern Wisconsin Open now (715) 450-9897

Asphalt Paving in Cottage Grove

Asphalt Paving in Cottage Grove, Minnesota.

Lot paving, overlays and tear-out-and-replace for commercial properties in Cottage Grove. Base graded, compacted and drained before any mix goes down.

4.7 from 21 Google reviews

About an hour and a half west of Eau Claire on I-94 and south on Highway 61. The estimate is free.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
4.7 Google ratingFrom 21 reviews
6-12 mo Before first sealNew asphalt has to cure
15-20 yrs Well-built drivewayIf it gets sealed

Working in Cottage Grove

The logistics park is 253 acres and nine buildings, about 3.4 million square feet, with direct access to Highway 61, I-494 and I-94, and Innovation Village is another 223 acres opened up along 61. There are 73 developable commercial acres left at Innovation Road as well. Pavement for that kind of use goes down on a base graded, compacted and drained to suit what will drive on it, because a lot built for cars and then used by trailers is a lot that fails early. New asphalt still waits six to twelve months for its first seal.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Cottage Grove

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Cottage Grove

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Cottage Grove

What Cottage Grove calls us about, answered straight.

More questions answered
How far out is this for you?
Cottage Grove is about 84 miles from Eau Claire and roughly an hour and a half: I-94 west, then south on Highway 61. For commercial lots we come out. Send the address and what the lot needs and we'll set up a time to walk it. The estimate is free.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

The Lots and Surfaces in Cottage Grove

Cottage Grove is in Washington County, about 43,000 people, served by US 61, US 10 and I-494. From Eau Claire it's about 84 miles and roughly an hour and a half, west on I-94 and then south on 61. The city puts its business park 11 miles off I-94 and a bit over six miles from I-494.

This is the industrial end of the corridor. The Cottage Grove Business Park is off Highway 61 at the Jamaica exit, four-lane frontage, lots divisible down to an acre and rail-served sites on the CP line, and the city's own list of firms out there runs from Airgas and United Rentals to Renewal by Andersen, Tradehome Shoes, the USPS and Up North Plastics. Werner Electric's headquarters and regional distribution center is on 95th Street South, a 122,000 square foot building on 20 acres that has since been expanded. 3M has run chemical operations here since 1947.

The newest ground is bigger still. Cottage Grove Logistics Park is a 253-acre site with nine industrial buildings planned, about 3.4 million square feet, with direct access to Highway 61, I-494 and I-94. Innovation Village is another 223 acres along 61, opened up by the 100th Street extension and a bridge over the CPKC railroad and aimed at logistics and distribution. The retail corridor is East Point Douglas Road South, with Cottage Grove Plaza and Gateway Center on it and a Walmart built on part of the old drive-in site; the rest of that ground is 73 developable commercial acres at Innovation Road. Three clinics serve the city, and the public campus is City Hall and public safety on Ravine Parkway with the HERO Center training campus and range next to it.

Where we work in Cottage Grove

  • Cottage Grove Business Park
  • Cottage Grove Logistics Park
  • Innovation Village
  • East Point Douglas Road South
  • Ravine Parkway South

Around Cottage Grove: Ravine Regional Park, The HERO Center on 85th Street South, Park Grove Library on Hemingway Avenue, River Oaks municipal golf course, Cottage Grove Plaza on East Point Douglas Road.

42,760 people, 2024 Census estimate.

The Mississippi valley outwash runs through here, sand and gravel that filled the valley and was later cut into flat terraces between 800 and 820 feet, and the valley widens near Cottage Grove. State building rules put the frost footing depth at 42 inches in Washington County.

Get a Free Estimate in Cottage Grove

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on commercial lots and properties in Cottage Grove
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?