Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Osseo

Concrete in Osseo, Wisconsin.

Concrete flatwork, aprons and curb in Osseo. Commercial pours go down at 4,500 PSI with tied rebar, priced and scheduled with the asphalt.

4.7 from 18 Google reviews

About 25 minutes southeast of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
1,818 People in Osseo
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Osseo
400°F Crack fillerDirect-fire rubber

What a Concrete Job Looks Like in Osseo

The interchange is the story. Travel-stop and fuel surface takes a kind of punishment almost nothing else does: constant heavy vehicles, tight turning circles, fuel and oil on the surface, and no quiet season to repair in. Sealer won't stick to a fuel-contaminated apron, and that has to be dealt with before anything else happens.

Away from the interchange, Tenth Street is the commercial strip and Eighth Street carries the hospital. Those are ordinary lots with ordinary wear, and they get quoted like anywhere else.

Concrete specifically in Osseo

Fuel aprons and truck pads, where the loading is genuinely severe and a slab poured for cars fails fast. Residential concrete is mostly garage aprons on the 1970s stock.

The Driveways and Lots in Osseo

Osseo sits where the north and south forks of the Buffalo River meet, in Trempealeau County, and more importantly where three routes converge: US 10, US 53 and Interstate 94. For a village of 1,811 that produces a commercial profile far larger than the population, concentrated around the interchange.

Over 28 percent of Osseo's housing was built in the 1970s, the sharpest single-decade concentration of any town in the service area. About a third predates 1960 and fewer than eighty units have gone up since 2000.

A 1970s drive is now fifty years old. Some were built properly and have been sealed on a cycle; those are straightforward. Others have never been touched, and on those the honest question is whether there's still a base worth building on.

Osseo

We work the whole village rather than a named handful of neighborhoods.

Around Osseo: Buffalo River, Buffalo River State Trail, I-94 interchange.

Standard 48-inch frost depth. Osseo sits on unglaciated ground like Strum, so the subgrade is residual soil rather than the sorted outwash of the Chippewa valley.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Osseo

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Osseo

Base, forms, steel, pour, finish, and the asphalt keyed back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt keyed to the new edge, compacted, joint sealed.

Questions We Get in Osseo

What Osseo calls us about, answered straight.

More questions answered
Is Osseo far enough south that the drive costs us something?
No. It is about twenty-five minutes down I-94 and we are through here often enough that it is not a special trip. As anywhere at that distance, two or three drives on the same street in one visit costs each of you noticeably less than one on its own.
We're right off the interchange and our lot takes semi traffic. Is that different?
Yes, and Osseo has more of it than a village of 1,800 normally would, because US 10, US 53 and Interstate 94 all meet here. A lot taking loaded trucks fails in specific places rather than evenly: where they turn in, where they stop, and wherever a trailer's landing gear comes down. Those spots need full-depth repair or concrete, not sealer, and the rest of the lot is usually fine. Worth walking the truck route separately from the car parking when we look at it.
How much does a concrete driveway cost?
Thickness, reinforcement and access are what move it. A slab that has to carry vehicles is thicker than one that carries feet, steel adds cost and adds life, and a pour a truck cannot reach has to be barrowed, which is labour. Removing the old surface is quoted separately rather than hidden in the rate, so you can see what each part costs.
Concrete or asphalt for a driveway?
Concrete costs roughly two to three times as much up front and lasts longer with less maintenance. Asphalt is cheaper, goes down faster, handles frost movement better, and needs sealing every two to three years. Which one suits comes down to the loading, the frost and the budget.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

Get a Free Estimate in Osseo

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.