Concrete flatwork, aprons and curb in Cadott. Commercial pours go down at 4,500 PSI with tied rebar, priced and scheduled with the asphalt.

4.7 from 21 Google reviews

About 30 minutes northeast of Eau Claire. The estimate is free.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
4.7 Google ratingFrom 21 reviews
4,500 PSI Exterior mixTied rebar where it carries trucks
3 days Back in serviceOn a dock apron we poured

Working in Cadott

Aprons and pads on the industrial side, at the extruder and the operation next to it, where the loading is genuine. In the village core it's usually the concrete apron that moved rather than the asphalt, and replacing one without resetting the other rebuilds the same step a year later. The joint between the two is nearly always the job here, not either surface on its own.

From our jobs

Job Photos

A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, at a national retailer
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two trades laid two materials and the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Cadott

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How We Do Concrete in Cadott

Base, forms, steel, pour, finish, and the asphalt tied back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt cut tight to the new edge, compacted, joint sealed.

Questions We Get in Cadott

What Cadott calls us about, answered straight.

More questions answered
Our lot gets hammered in festival season. When should we get work done?
Ahead of it, not after it, and that means booking in spring rather than calling in July. Sealer needs the lot clear and dry for about a day per section, which is impossible on a festival weekend and easy in May. If the damage is already done, September works too and the surface goes into winter protected.
How far out is Cadott, and does the drive change the price?
About thirty minutes northeast, and it is well inside the area rather than at the edge of it. The estimate is free, and the number you approve is the number you pay.
How much does a concrete driveway cost?
Thickness, reinforcement and access are what move it. A slab that has to carry vehicles is thicker than one that carries feet, steel adds cost and adds life, and a pour a truck cannot reach has to be wheelbarrowed, which is labor. Removing the old surface is quoted separately rather than hidden in the rate, so you can see what each part costs.
Concrete or asphalt for a driveway?
Concrete costs roughly two to three times as much up front and lasts longer with less maintenance. Asphalt is cheaper, goes down faster, handles frost movement better, and needs sealing every two to three years. Which one suits comes down to the loading, the frost and the budget.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

The Driveways and Lots in Cadott

Cadott sits in Chippewa County where Highway 27 crosses Highway 29 and the Yellow River, halfway between Chippewa Falls and Stanley on the four-lane. The village has advertised itself since 1955 as the halfway point between the equator and the North Pole, and the sign in the park is honest enough to add that the actual line is three miles north.

Main Street carries Highway 27 through the village and holds the hardware store, the bakery, the library, the dental and chiropractic offices and the funeral home. Tower Drive on the Highway 29 side is the industrial street, with a plastics extruder in a building of 66,000 square feet and a maple syrup operation next door.

The thing that makes Cadott unusual is what happens in summer. The festival grounds on County S bring two very large music events through a village of fifteen hundred, and for those weeks every lot in town takes traffic it was never designed for. If you run a business here, that's when your surface ages, and June is the wrong month to be starting the conversation.

The 1970s are Cadott's biggest decade, at just under a quarter of the housing, with another fifth predating 1940 and very little in the 1940s or 1960s. About two thirds of the village predates 1980.

The practical read is that Cadott has two kinds of driveway and not much in between: fifty-year-old surfaces that are at or past the end of a normal life, and genuinely old ones. A 1970s drive that's been sealed on a cycle can still be in good order. One that never has is usually a different conversation.

Cadott

We work all of Cadott rather than a named handful of neighborhoods.

Around Cadott: Main Street, 45th parallel marker, Yellow River.

1,467 people, 2024 Census estimate.

Standard 48-inch frost depth. Far enough from the Chippewa valley floor that spring opens a few days later than it does in town.

Get a Free Estimate in Cadott

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.

What can we help with?