Asphalt Paving in Cadott

Asphalt Paving in Cadott, Wisconsin.

Asphalt driveways, overlays and small lot paving in Cadott.

4.7 from 18 Google reviews

About 30 minutes northeast of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
1,467 People in Cadott
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Cadott
400°F Crack fillerDirect-fire rubber

What an Asphalt Paving Job Looks Like in Cadott

Main Street carries Highway 27 through the village and holds the hardware store, the bakery, the library, the dental and chiropractic offices and the funeral home. Tower Drive on the Highway 29 side is the industrial street, with a plastics extruder in a building of 66,000 square feet and a maple syrup operation next door.

The thing that makes Cadott unusual is what happens in summer. The festival grounds on County S bring two very large music events through a village of fifteen hundred, and for those weeks every lot in town takes traffic it was never designed for. If you run a business here, that's when your surface ages, and June is the wrong month to be starting the conversation.

Asphalt Paving specifically in Cadott

Overlay suits the better-kept 1970s stock, and Cadott has a good supply of it: the drives that were sealed on a cycle are worn on top and sound underneath, which is the best case a paving quote has. Where a drive that age has never been maintained, the base is often the real problem and an overlay just repeats its shape in fresh material. Telling those two apart is most of the estimate.

The Driveways and Lots in Cadott

Cadott sits in Chippewa County where Highway 27 crosses Highway 29 and the Yellow River, halfway between Chippewa Falls and Stanley on the four-lane. The village has advertised itself since 1955 as the halfway point between the equator and the North Pole, and the sign in the park is honest enough to add that the actual line is three miles north.

The 1970s are Cadott's biggest decade, at just under a quarter of the housing, with another fifth predating 1940 and very little in the 1940s or 1960s. About two thirds of the village predates 1980.

The practical read is that Cadott has two kinds of driveway and not much in between: fifty-year-old surfaces that are at or past the end of a normal life, and genuinely old ones. A 1970s drive that's been sealed on a cycle can still be in good order. One that never has is usually a different conversation.

Cadott

We work the whole village rather than a named handful of neighborhoods.

Around Cadott: Main Street, 45th parallel marker, Yellow River.

Standard 48-inch frost depth. Far enough from the Chippewa valley floor that spring opens a few days later than it does in town.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Cadott

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Cadott

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Cadott

What Cadott calls us about, answered straight.

More questions answered
Our lot gets hammered in festival season. When should we get work done?
Ahead of it, not after it, and that means booking in spring rather than calling in July. Sealer needs the lot clear and dry for about a day per section, which is impossible on a festival weekend and easy in May. If the damage is already done, September works too and the surface goes into winter protected.
The village overflow parking takes cars twice a year. Does that matter?
It matters most to what is underneath. A surface specified for ordinary use and then loaded hard for two weekends a year does not fail evenly: it settles where the weight concentrated, which is usually over a storm structure or at an entrance. That is worth catching while the frame is only settling, because a reset is a fraction of a rebuild.
How far out is Cadott, and does the drive change the price?
About thirty minutes northeast, and it is well inside the area rather than at the edge of it. The estimate is free, and the number you approve is the number you pay.
How much does a new asphalt driveway cost?
It comes down to three things: the square footage, whether the existing base can be built on or has to come out, and how much of the drive a truck can reach. An overlay over a sound base is the cheapest way to a new surface; a full tear out and replace is the most expensive and is sometimes the only thing that lasts. Asphalt also tracks the oil market, so a number from last season is not a number for this one. We measure it and price it, free either way.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can a new driveway be sealed?
Six to twelve months after paving. New asphalt needs to cure and release its lighter oils first, and sealing early traps them. Anyone offering to seal brand new asphalt is telling you something about how they work.
How long does a well-built driveway last?
Fifteen to twenty years if the base was done properly and it gets sealed every two to three years. Without sealing, closer to ten, because oxidation and water take it from the surface down.
Can you pave a gravel driveway?
Yes, and it's common out in the townships. The grading and drainage are most of the job, and the setup on a long drive is spread over more feet.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

Get a Free Estimate in Cadott

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.