Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Asphalt Paving in Colfax

Asphalt Paving in Colfax, Wisconsin.

Asphalt driveways, overlays and small lot paving in Colfax.

4.7 from 18 Google reviews

About 25 minutes northwest of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
1,252 People in Colfax
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Colfax
400°F Crack fillerDirect-fire rubber

What an Asphalt Paving Job Looks Like in Colfax

For a village of this size the commercial surface is unusually spread out, which matters when you're pricing a job rather than looking at a map.

Main Street is the retail corridor and it runs in two clusters, the 100 block and then the 400 through 600 blocks, with small frontages and shared access. East Railroad Avenue is the second one, and it's the heavier of the two: the co-op with its fuel and agronomy traffic, the village public works yard, the museum. University Avenue is the whole school campus on a single site, elementary and high school together, which is one large parking area with a summer-only window.

Then there's manufacturing, on Bremer Avenue and Willow Street, which is genuine industrial loading in a village most people drive through without noticing it has any.

Asphalt Paving specifically in Colfax

Full replacement comes up more often on the older, pre-tornado stock, where the base was never built to carry what parks on it now. Gravel conversions come up on the county roads out of the village.

The Driveways and Lots in Colfax

Colfax sits on the Red Cedar River in Dunn County where Eighteen Mile Creek joins it, about eight miles north of the I-94 corridor. Highways 40 and 170 are the routes through the village. The river banks here are steep and wooded with sandstone outcrops, which isn't incidental: the village had a sandstone quarrying industry and its two landmark buildings are both built from the local stone.

Colfax is really two housing stocks, and the reason is specific. On June 4, 1958 an F5 tornado crossed the south and east of the village and leveled dozens of homes. Those parts were rebuilt afterwards, and the Census figures still show it: almost 30 percent of the housing here dates from the 1950s, a far larger share than any other town in the area, with driveways laid to match.

The parts the tornado missed still carry the older stock, including the 1915 municipal building on Main Street and the 1914 depot that's now the railroad museum. What that means in practice is that two drives a few streets apart in Colfax can be forty years different in age, and they want different answers.

Colfax

We work the whole village rather than a named handful of neighborhoods.

Around Colfax: Colfax Municipal Building, Colfax Railroad Museum, Red Cedar River, Colfax Red Cedar Preserve, Felland Park.

Standard 48-inch frost depth. The Red Cedar corridor through the village has steep banks and real grade change, so drainage varies sharply between the river side and the flat ground west of Main Street.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Colfax

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Colfax

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Colfax

What Colfax calls us about, answered straight.

More questions answered
Our house is in the part of town that was rebuilt after the tornado. Does that matter?
It tells us roughly what the driveway is: late 1950s or 1960s, often laid thin over whatever base was there at the time. Some of those have held up well and seal beautifully. Others have a base that was never really built, and no amount of sealer fixes that. The age narrows it down; walking on it settles it.
Is Colfax too far out for a driveway job?
No. It's about twenty-five minutes and we work Dunn County regularly. As everywhere, several drives on one street in one visit costs each of you less than one drive on its own.
Our drive is on the river side and the neighbor's is up on the flat. Same job?
Usually not. The Red Cedar corridor through the village has steep banks and real grade change, and the ground west of Main Street is flat by comparison. On a slope the water moves, which means a crack acts as an inlet and takes fine material out of the base as it drains. On the flat the water sits, which is a different problem with a different answer. Two drives a few streets apart here genuinely want different work.
Fewer than half the homes here are single-family. Does that change anything?
It means a real share of what looks like residential work is actually shared surface: duplexes, small apartment buildings and the parking that goes with them. Those carry more vehicles than a single drive does, wear at the entrance and the aisle rather than in the middle, and get quoted like a small lot with the bid saying which areas are included. That last part matters when more than one person has to approve the number.
How much does a new asphalt driveway cost?
It comes down to three things: the square footage, whether the existing base can be built on or has to come out, and how much of the drive a truck can reach. An overlay over a sound base is the cheapest way to a new surface; a full tear out and replace is the most expensive and is sometimes the only thing that lasts. Asphalt also tracks the oil market, so a number from last season is not a number for this one. We measure it and price it, free either way.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can a new driveway be sealed?
Six to twelve months after paving. New asphalt needs to cure and release its lighter oils first, and sealing early traps them. Anyone offering to seal brand new asphalt is telling you something about how they work.
How long does a well-built driveway last?
Fifteen to twenty years if the base was done properly and it gets sealed every two to three years. Without sealing, closer to ten, because oxidation and water take it from the surface down.
Can you pave a gravel driveway?
Yes, and it's common out in the townships. The grading and drainage are most of the job, and the setup on a long drive is spread over more feet.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

Get a Free Estimate in Colfax

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.