Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Asphalt Paving in Chippewa Falls

Asphalt Paving in Chippewa Falls, Wisconsin.

Asphalt driveways, overlays and small lot paving in Chippewa Falls.

4.7 from 18 Google reviews

About 15 minutes from Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
15,075 People in Chippewa Falls
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Chippewa Falls
400°F Crack fillerDirect-fire rubber

What an Asphalt Paving Job Looks Like in Chippewa Falls

Old housing means old driveways, and old driveways in this valley were often laid thin over a base that was never really built. That's the honest problem in Chippewa Falls: more of the surfaces we look at here are genuinely past sealing than anywhere else we work, and telling somebody that costs us the easy job.

The commercial side is the opposite story. The industrial parks on the east side and out toward Lake Wissota are newer, larger and truck-heavy, with the kind of lots where catch basins and dock aprons carry real weight and fail on a schedule.

Asphalt Paving specifically in Chippewa Falls

Full replacement comes up more often here than in the newer towns, and the reason is that Chippewa Falls has the oldest stock in the valley by a clear margin. A 1950s drive laid thin over unimproved ground has nothing under it to overlay onto, so a new surface follows the same failing shape within a few winters. We say that before quoting one rather than after. Where the base was built properly, an overlay is still the right and cheaper answer.

The Driveways and Lots in Chippewa Falls

Chippewa Falls sits on the north bank of the Chippewa River with Duncan Creek running through the middle of it and Lake Wissota about three miles east. The West Hill rises on a bluff west of downtown, so the town has real grade: the hill and the river flats drain completely differently, and pavement on each behaves accordingly.

Chippewa Falls has the oldest housing stock we work in. Thirty-one percent of the city's houses were built before 1940, which is nearly double Eau Claire's share and eight times Lake Hallie's. Only about 16 percent has gone up since 2000.

The West Hill historic district is the clearest example: 163 contributing properties across 66 acres, running from 1870s lumber-baron mansions to 1950s ranch houses, sometimes on the same block. What that means practically is narrow drives, steep approaches, tight turns beside a house, and a lot of hand work. It's not a spray-and-go town.

Where we work in Chippewa Falls

  • West Hill
  • Downtown and Bridge Street
  • East Hill
  • Riverside
  • Lake Wissota

Around Chippewa Falls: Leinenkugel's Brewery, Irvine Park, Northern Wisconsin State Fairgrounds, Heyde Center for the Arts, Lake Wissota.

Same freeze regime as the rest of the valley, with footings required at 48 inches minimum. The difference here is the bluff: water coming off West Hill has somewhere to go and takes the long way, so drives at the bottom of a grade see far more of it than the ones at the top.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Chippewa Falls

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Chippewa Falls

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Chippewa Falls

What Chippewa Falls calls us about, answered straight.

More questions answered
Our house is in the West Hill historic district. Are there rules about the driveway?
Resurfacing or sealing an existing drive is maintenance rather than a visible alteration, and it isn't the kind of thing that normally raises a question. Changing the shape of a drive, its material or its width is a different matter, and the city is the right place to ask before anyone quotes it. The estimate says which side of that line your job is on.
Why does everything cost more per square foot on a small old driveway?
Because it isn't the square footage that costs, it's the edges and the access. A pre-war drive on the West Hill bluff is narrow, often steep, and frequently runs right up against a foundation or a retaining wall, so both sides get cut in by hand rather than sprayed. A wide modern drive with grass on either side takes a fraction of the time for twice the area. We price that in rather than discovering it on the day.
How much does a new asphalt driveway cost?
It comes down to three things: the square footage, whether the existing base can be built on or has to come out, and how much of the drive a truck can reach. An overlay over a sound base is the cheapest way to a new surface; a full tear out and replace is the most expensive and is sometimes the only thing that lasts. Asphalt also tracks the oil market, so a number from last season is not a number for this one. We measure it and price it, free either way.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can a new driveway be sealed?
Six to twelve months after paving. New asphalt needs to cure and release its lighter oils first, and sealing early traps them. Anyone offering to seal brand new asphalt is telling you something about how they work.
How long does a well-built driveway last?
Fifteen to twenty years if the base was done properly and it gets sealed every two to three years. Without sealing, closer to ten, because oxidation and water take it from the surface down.
Can you pave a gravel driveway?
Yes, and it's common out in the townships. The grading and drainage are most of the job, and the setup on a long drive is spread over more feet.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

Get a Free Estimate in Chippewa Falls

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.