Crack Filling and Sealing in Fall Creek
Crack Filling and Sealing in Fall Creek, Wisconsin.
Hot rubber crack filling for driveways and lots in Fall Creek, before the freeze does the expensive part.
About 15 minutes east of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

What a Crack Filling and Sealing Job Looks Like in Fall Creek
Three parts of Fall Creek generate nearly all of its pavement work, and they could not be more different from each other.
Brickyard Street is the industrial one. The village business park sits there, twenty-odd acres beside Highway 12, and it carries the heaviest truck traffic and the largest private lots in the village. East Hoover Avenue is the school campus, elementary, middle and high all on the same site, which makes it the single largest parking demand in town and a job that has to happen inside a summer window. Lincoln Avenue is the main street: banks, bars, the cafe, the post office, all with small frontages and shared access.
The fourth is seasonal. The grain and feed co-op on East Miami Avenue takes farm truck traffic in a concentrated few weeks, which is hard on a surface in a way that steady daily use isn't.
Crack Filling and Sealing specifically in Fall Creek
The low ground near the creek and the river holds water into spring, and cracks there open faster than the same crack on higher ground a few streets away. Hot rubber before the freeze is worth more here than the surface appearance suggests.
The Driveways and Lots in Fall Creek
Fall Creek sits on US Highway 12 about twelve miles east of Eau Claire, with I-94 another twelve miles on and County Road K running north toward Highway 29. The village takes its name from the rapids on the creek that runs through it, and the Eau Claire River passes just to the north.
A small village of about two square miles, so the housing is what you would expect: a compact grid of older homes near Lincoln Avenue and newer building out toward the edges. Drives here are shorter than the township average and longer than a town lot, which usually puts a whole driveway inside a single visit.
The more interesting pavement in Fall Creek isn't residential. For a village this size it carries an unusual amount of commercial and industrial surface, and that's where most of our work here happens.
Fall Creek
We work the whole village rather than a named handful of neighborhoods.
Around Fall Creek: Fall Creek Memorial Park, Keller Park, Randall Park, Beaver Creek Reserve, Hobbs Observatory.
Same freeze regime as the rest of the valley, with footings at 48 inches minimum. The creek and the Eau Claire River both run close, so the low ground near them holds water into spring longer than the higher parts of the village.
From our jobs
Job Photos
Hot rubber vs. cold pour
The stuff in a jug at the hardware store is cold pour. It goes in as a liquid, dries, shrinks, and sits in the crack like a rubber band laid in a trench. It's not bonded to anything. The first hard freeze pulls the crack open, the filler has nothing holding it to the walls, and it lifts out in a strip. Most people have seen this happen and assumed it was a bad batch. Hot-applied rubber goes in at around 400 degrees. At that temperature it's thin enough to run down into the crack instead of bridging it, and hot enough to melt into the asphalt faces on either side. When it cools it has bonded to the walls of the crack, so when the crack moves, the filler moves with it.
Cold pour
The jug from the hardware store, and what a cheap quote uses
- Sits in the crack rather than bonding to it
- Shrinks as it cures, leaving a channel down the middle
- Pulls out in strips after the first hard winter
- Cheap enough that it gets redone every year, which isn't cheap
Hot-applied rubber
What comes off our kettle
- Flows to the bottom of the crack at 400 degrees
- Melts into the asphalt faces and bonds to both walls
- Stays flexible, so it moves when the crack moves
- Holds for years, not for one season
This is the one place where the cheaper option isn't a smaller version of the right one. It's a different product doing a different thing.
What Decides the Price in Fall Creek
Priced by the foot of crack, not by the area of the surface, because that's what actually drives the work. Usually done as part of a sealcoating job, where it costs less than it would on its own.
With a sealcoat job
Driveway
Measured on site
- Most driveways need some, and it's included up to a point
- Heavy cracking is quoted separately and said up front
Crack filling alone
Driveway, no sealcoat
Measured on site
- Worth doing on its own if the surface is otherwise sound
Commercial lot
Per linear foot
Measured on site
- Depends on crack width, depth and how much routing it needs
- Most lots are quoted as a lump sum after a walk
Cracks wider than about an inch and a half, or ones that have broken into a network, are past filling. Those get cut out and patched rather than filled with something that will not hold.
How the Work Goes in Fall Creek
Done before sealer, always: sealer can't bridge an open crack.
Clean the crack out
Blown out with compressed air, vegetation and old failed filler removed. Rubber won't bond to dirt any more than sealer will.
Rout the wide ones
Wide or heavily worked cracks get cut to a consistent reservoir so the filler has a proper shape to sit in. Not every crack needs it; the ones that do are the ones that have already failed once.
Fill hot
Direct-fire kettle, rubber at 400 degrees, wanded into the crack until it's full from the bottom up rather than skinned over at the top.
Squeegee and let it set
Struck off flush or slightly banded over, depending on the surface. Sets hard enough to drive on in under an hour in most conditions.
Questions We Get in Fall Creek
What Fall Creek calls us about, answered straight.
More questions answeredDo you come out to Fall Creek for a single driveway?
We're on Highway 12 with a fire number rather than a village address. Still in the area?
The co-op takes farm trucks for a few weeks a year. Is that hard on a surface?
Is the low ground near the creek different from up in the village?
How much does crack filling cost?
Why does the temperature of the crack filler matter?
Should I fill cracks before sealcoating or after?
Is there a crack too big to fill?
When is the best time of year for crack filling?
Get a Free Estimate in Fall Creek
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on driveways and lots anywhere in the service area
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in Fall Creek
- Sealcoating in Fall Creek
- Asphalt Repair and Patching in Fall Creek
- Catch Basin Repair in Fall Creek
- Parking Lot Striping in Fall Creek
- Track and Athletic Surfaces in Fall Creek
- Concrete in Fall Creek
- Asphalt Paving in Fall Creek
- Commercial Snow Removal in Fall Creek
Crack Filling and Sealing in Nearby Towns
- Crack Filling and Sealing in Altoona
- Crack Filling and Sealing in Augusta
- Crack Filling and Sealing in Lake Hallie
- Crack Filling and Sealing in Eau Claire
- Crack Filling and Sealing in Chippewa Falls
- Crack Filling and Sealing in Osseo
Everything about crack filling and sealing, including how the work goes and what changes the price


