Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Crack Filling and Sealing in Altoona

Crack Filling and Sealing in Altoona, Wisconsin.

Hot rubber crack filling for driveways and lots in Altoona, before the freeze does the expensive part.

4.7 from 18 Google reviews

About 8 minutes from central Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A web of freshly filled cracks running across a parking lot, the rubber still glossy.
9,302 People in Altoona
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Altoona
400°F Crack fillerDirect-fire rubber

What a Crack Filling and Sealing Job Looks Like in Altoona

The interesting thing about Altoona for pavement is the age gap. The 1970s subdivisions are at the point where their original surfaces are long gone and the question is whether the base is still worth building on. The River Prairie construction is the opposite problem: those drives and lots are new enough that leaving them alone for another year or two is usually the right call.

We get asked to seal brand new asphalt here more than anywhere else, and the answer is usually no, not yet. New asphalt wants six to twelve months to cure first.

Crack Filling and Sealing specifically in Altoona

The older east-side stock is where the crack filling is. Drives from the 1970s that have been sealed a few times still open up at the same joints every few years, and hot rubber into those is far cheaper than letting them widen. The joints reopen because that's where the slab moved, not because the last seal failed, so filling them is maintenance rather than a repair of somebody's mistake.

The Driveways and Lots in Altoona

Altoona sits immediately east of Eau Claire, close enough that Fairfax Street is most of what separates them. Lake Altoona and the Eau Claire River form the northern edge and Otter Creek the southern one. The US 53 bypass opened in 2006 with an interchange at River Prairie Drive, and essentially everything new in town has been built around that interchange since.

Altoona is the youngest town we serve after Lake Hallie, and it's split in two. Only about 12 percent of the housing predates 1960. The 1970s and 1990s each contributed close to a fifth of the stock, and then nearly a quarter has gone up since 2010, almost all of it in and around River Prairie.

It also has the highest share of manufactured housing of the five, close to 10 percent. That's a different kind of drive: often shared, often gravel or thin asphalt, and usually maintained by a community owner rather than a resident.

Where we work in Altoona

  • Downtown Altoona
  • River Prairie
  • East Hill
  • Hillcrest

Around Altoona: Lake Altoona County Park, River Prairie Park, Cinder City Park, The Yard, Otter Creek.

Identical freeze regime to Eau Claire next door, with the 48-inch footing minimum. Lake Altoona and Otter Creek mean the north and south edges of town both sit close to water, and the drives nearest them hold moisture longer in spring.

From our jobs

Job Photos

The crack crew's trucks and melter working a tree-lined road, road work sign up
The crack crew working a town road
The company flatbed and the yellow crack-seal melter on a road shoulder, two crew in hi-vis working ahead of it
The melter on site, crew working ahead of it

All job photos

Hot rubber vs. cold pour

The stuff in a jug at the hardware store is cold pour. It goes in as a liquid, dries, shrinks, and sits in the crack like a rubber band laid in a trench. It's not bonded to anything. The first hard freeze pulls the crack open, the filler has nothing holding it to the walls, and it lifts out in a strip. Most people have seen this happen and assumed it was a bad batch. Hot-applied rubber goes in at around 400 degrees. At that temperature it's thin enough to run down into the crack instead of bridging it, and hot enough to melt into the asphalt faces on either side. When it cools it has bonded to the walls of the crack, so when the crack moves, the filler moves with it.

Cold pour

The jug from the hardware store, and what a cheap quote uses

  • Sits in the crack rather than bonding to it
  • Shrinks as it cures, leaving a channel down the middle
  • Pulls out in strips after the first hard winter
  • Cheap enough that it gets redone every year, which isn't cheap

Hot-applied rubber

What comes off our kettle

  • Flows to the bottom of the crack at 400 degrees
  • Melts into the asphalt faces and bonds to both walls
  • Stays flexible, so it moves when the crack moves
  • Holds for years, not for one season

This is the one place where the cheaper option isn't a smaller version of the right one. It's a different product doing a different thing.

What Decides the Price in Altoona

Priced by the foot of crack, not by the area of the surface, because that's what actually drives the work. Usually done as part of a sealcoating job, where it costs less than it would on its own.

Crack filling alone

Driveway, no sealcoat

Measured on site

  • Worth doing on its own if the surface is otherwise sound

Commercial lot

Per linear foot

Measured on site

  • Depends on crack width, depth and how much routing it needs
  • Most lots are quoted as a lump sum after a walk

Cracks wider than about an inch and a half, or ones that have broken into a network, are past filling. Those get cut out and patched rather than filled with something that will not hold.

How the Work Goes in Altoona

Done before sealer, always: sealer can't bridge an open crack.

Clean the crack out

Blown out with compressed air, vegetation and old failed filler removed. Rubber won't bond to dirt any more than sealer will.

Rout the wide ones

Wide or heavily worked cracks get cut to a consistent reservoir so the filler has a proper shape to sit in. Not every crack needs it; the ones that do are the ones that have already failed once.

Fill hot

Direct-fire kettle, rubber at 400 degrees, wanded into the crack until it's full from the bottom up rather than skinned over at the top.

Squeegee and let it set

Struck off flush or slightly banded over, depending on the surface. Sets hard enough to drive on in under an hour in most conditions.

Questions We Get in Altoona

What Altoona calls us about, answered straight.

More questions answered
Our house in River Prairie is only a few years old. Should we seal the driveway?
Not until it has cured, which takes six to twelve months from paving, and often not for a couple of years after that. Sealing new asphalt too early traps the lighter oils and does more harm than waiting. We would rather book you for a later season than take the job now.
We manage a manufactured home community. Do you do shared drives?
Yes, and it's common work in Altoona given how much of the housing here is manufactured. Shared drives and internal roads are quoted like a small commercial lot rather than like a driveway.
How do we know whether our drive is an East Hill one or a River Prairie one?
By its age rather than its address, though in Altoona the two usually agree. The 1970s and 1990s stock on the east side is at the point where the surface is spent and the base underneath is normally still sound, which is the best case sealing has. River Prairie has been going up since 2015, and most of what's there is too young to want anything yet. If you're not sure which one you have, that's what the estimate is for.
The bypass changed the traffic past our lot. Does that show up in the pavement?
It can, and the tell is where rather than how much. The US 53 bypass opened in 2006 and pulled through traffic off the old routes onto the River Prairie Drive interchange, so the newer commercial ground carries the turning and stopping now while the Business 53 side carries the age. Those two wear differently: one ruts and scuffs at the entrances, the other simply gets old.
How much does crack filling cost?
It is priced by the linear foot of crack rather than by the size of the surface, so a big driveway with four cracks costs less than a small one that has opened up all over. Width matters too: anything wide enough to need routing out first takes longer. On a driveway it is usually included up to a point when it is done with a sealcoat rather than billed on its own.
Why does the temperature of the crack filler matter?
At 400 degrees the rubber is thin enough to reach the bottom of the crack and hot enough to melt into the asphalt on both sides, so it bonds. Cold pour filler can't do either, which is why it lifts out in strips after a winter.
Should I fill cracks before sealcoating or after?
Before, always. Sealer is a thin wear layer and it can't bridge an open crack. Sealing over one changes its color and nothing else, and the crack reappears through the new surface within weeks.
Is there a crack too big to fill?
Yes. Past about an inch and a half, or once cracking has broken into a network of squares, filling won't hold because the surface around it is moving independently. Those areas get cut out and patched instead.
When is the best time of year for crack filling?
Spring or early fall in Altoona and the surrounding area is ideal, because cracks are at a middling width. In high summer they're at their tightest and in deep winter they're at their widest, and filling at either extreme means the filler is working against the movement rather than with it.

Get a Free Estimate in Altoona

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.