Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Asphalt Paving in Augusta

Asphalt Paving in Augusta, Wisconsin.

Asphalt driveways, overlays and small lot paving in Augusta.

4.7 from 18 Google reviews

About 25 minutes southeast of Eau Claire on Highway 12. Free estimates, and a straight read on whether it needs doing yet.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
1,495 People in Augusta
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Augusta
400°F Crack fillerDirect-fire rubber

What an Asphalt Paving Job Looks Like in Augusta

Lincoln Street is the commercial spine, carrying Highway 12 east and west through town, with the bank, the hardware store, the pharmacy, the clinic and most of the food and drink strung along it. Stone Street is the secondary cluster.

Industrial Drive at the west end is where the square footage is. Augusta has a genuine industrial base for a town of 1,567, including the plant where Bush's baked beans were first made, and that's loading dock and truck yard surface rather than parking lot. It fails differently and it gets specified differently.

Asphalt Paving specifically in Augusta

Full replacement comes up regularly here because of the age of the stock: seven housing units went up in Augusta in the entire 2010s, so there is essentially no new driveway in town. Where the base was never engineered and the ground stays damp, an overlay follows the same failing shape, and we would rather build it properly than sell you the cheaper version twice.

The Driveways and Lots in Augusta

Augusta sits in southeastern Eau Claire County where Highway 12 runs east and Highway 27 crosses it, about ten miles north of the interstate. Bridge Creek and Diamond Valley Creek run through town, both trout water, which is a nicer way of saying there's more groundwater under this town than under most.

Augusta has the oldest building profile of any town in the southern half of the service area. A third of its houses were built before 1940, more than three quarters before 1980, and just seven units went up in the entire 2010s.

So the honest starting question here is rarely what color sealer. It's whether the drive under it's still worth protecting. On a good number of Augusta drives it very much is, because a well-built old surface outlasts a badly built new one. On others the base gave out years ago and no coating changes that.

Augusta

We work the whole village rather than a named handful of neighborhoods.

Around Augusta: Lincoln Street, Dells Mill, Augusta Wildlife Area.

Standard 48-inch frost depth, with more shallow groundwater than the norm because of the two creeks. Wet subgrade heaves harder than dry subgrade does.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Augusta

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Augusta

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Augusta

What Augusta calls us about, answered straight.

More questions answered
The ground here is wet. Does that change what we should do?
It changes what matters. Augusta has two creeks through it and shallower groundwater than most towns we work in, and wet subgrade heaves harder in a freeze than dry subgrade does. That makes crack sealing worth more here than average, because keeping surface water out of an already damp base is the whole game.
Almost nothing new has been built here. Does that make it harder to price?
It makes the looking matter more and the measuring matter less. Seven housing units went up in Augusta in the whole of the 2010s, so essentially every drive in town has decades on it and a history we cannot see from the road. The square footage takes a minute. Working out whether what is under the surface is still worth protecting is the part that decides the number.
Can you work the Industrial Drive properties, or is that a different contractor?
Same contractor, different job. Dock aprons and truck yards take loading that a parking lot never sees, so they fail as rutting along a repeated wheel path and as edge break-up rather than as a hole in the middle. Those are full-depth repairs and they want walking before a number goes on paper. Start that conversation ahead of the season rather than during it.
Is Augusta far enough out that the drive costs us something?
Augusta is about twenty-five minutes southeast on Highway 12 and it is inside the area we work rather than at the edge of it. The estimate is free, and the number you approve is the number you pay.
How much does a new asphalt driveway cost?
It comes down to three things: the square footage, whether the existing base can be built on or has to come out, and how much of the drive a truck can reach. An overlay over a sound base is the cheapest way to a new surface; a full tear out and replace is the most expensive and is sometimes the only thing that lasts. Asphalt also tracks the oil market, so a number from last season is not a number for this one. We measure it and price it, free either way.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can a new driveway be sealed?
Six to twelve months after paving. New asphalt needs to cure and release its lighter oils first, and sealing early traps them. Anyone offering to seal brand new asphalt is telling you something about how they work.
How long does a well-built driveway last?
Fifteen to twenty years if the base was done properly and it gets sealed every two to three years. Without sealing, closer to ten, because oxidation and water take it from the surface down.
Can you pave a gravel driveway?
Yes, and it's common out in the townships. The grading and drainage are most of the job, and the setup on a long drive is spread over more feet.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

Get a Free Estimate in Augusta

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.