Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897
Two crew in hi-vis working a curb and gutter pour at a national retailer, wooden radius forms staked along the curve, rebar dowels standing at the joint and the finished gutter running around the island

Concrete repair · Based in Eau Claire

Concrete Curb and Gutter Replacement for Parking Lots

The curb takes the plow and the gutter takes the salt, so the curb line is where a lot starts failing. Sections come out joint to joint, formed to the radius, doweled into the curb on either side, and the asphalt tied back in.

Radiusforms built to the curve
Rebardoweled at the joint
2.0%grade the WAPA guide calls for
Freeestimates

What Curb and Gutter Is

Curb and gutter is one piece of concrete doing two jobs. The curb is the vertical face that keeps traffic off the island or the landscaping. The gutter is the flat strip at the bottom of it, and it is the channel the lot drains along on its way to a catch basin.

A curb is a drainage structure as much as it is an edge. Water comes off the asphalt, runs to the gutter, and follows the gutter to the grate. When a length of that gutter is broken, tipped, or sitting at the wrong height, water stops going where the lot was built to send it and starts standing somewhere it was not.

The Wisconsin Asphalt Pavement Association's 2018 parking lot design guide puts a number on the fall a curbed lot needs: at least 2.0 percent, with 1.0 percent the minimum, and it says lots with grades flatter than 2 percent are subject to surface ponding and birdbaths. That is the association's guidance rather than a code, and it is a useful thing to hold a lot against when the water is not moving.

The two parts

  • The curb face, which keeps traffic off
  • The gutter, which carries the water
  • The joint at the back, where the asphalt meets it

The gutter carries water to the structure in the lot, and a basin that has sunk will still pond after new curb goes in. See catch basin installation.

What Winter Does to a Curb

Four things, and all four are winter.

The plow blade rides up the gutter and catches the curb face. It takes the nose off in chunks, usually in the same few places year after year, and the broken face is open concrete from then on.

The gutter holds the salt. Everything on the lot drains to it, so the slush that sits in the gutter sits there longest and with the most de-icer in it. The gutter scales before any other concrete on the property.

Meltwater that cannot get to the basin ends up behind the curb instead. It freezes there, frost lifts the back of the section, and the face tips out of plumb.

Once the face has tipped, the joint between the curb and the asphalt is open. Water goes down that joint into the base under the asphalt, and the lot fails in a strip along the curb line while the middle of it still looks fine.

What we look at

  • Where the plow has taken the face off
  • Whether the gutter is scaled or still tight
  • Whether the face is plumb or leaning out
  • Whether the joint at the back is open
  • Where the gutter is trying to send the water
  • What the asphalt along the curb line is doing

A curb that has been hit and a curb that has moved are different jobs. The second one has a base problem behind it, and new concrete on the same ground tips again.

What the Code Says About Curb Work

Two of these are Chippewa Falls' ordinance and the third is an association's design guide. Each is attributed to where it comes from, because they are not the same kind of thing.

WhatThe ruleWhose rule it is
A drive opening cut into existing curb The entire curb and gutter is removed and reconstructed of concrete to form a standard drive opening Chippewa Falls 8.04(9)(a)
Curb removed for that work Restored within 30 days of the removal beginning Chippewa Falls 8.04(9)(d)
Grade on curbed pavement At least 2.0 percent, 1.0 percent minimum; flatter than 2 percent is subject to ponding and birdbaths Wisconsin Asphalt Pavement Association, 2018 Parking Lot Design Guide

The first two rows are Chippewa Falls' code and apply to a property in Chippewa Falls. In Eau Claire, work in a street, alley or public place goes through the Engineering department under 13.10.020, and what a curb cut has to become there is on the driveway approach page.

How We Replace a Curb and Gutter Section

Measured joint to joint, cut out, based, formed to the radius, poured and tied back into the asphalt.

Measure the section that comes out

Curb and gutter goes back joint to joint, so what comes out runs past where the nose has broken or the face has tipped, to the joints on either side of the damage.

Saw cut at the joints

Cut at the joint lines, so the new section starts against a straight vertical face rather than against a broken one.

Break out the curb and haul it off

Broken curb and gutter out and hauled away, down to whatever the new pour needs to sit on, including the ground behind the face where frost lifted it.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete, and a curb on soft ground tips before it cracks.

Build the radius forms and set the dowels

Radius forms built to the curve rather than faceted out of straight boards, staked off, with rebar dowels set into the ends of the existing curb so the sections stay in one plane.

Pour and finish the gutter to grade

Placed, screeded and floated, with the gutter finished to the fall it needs so water leaves along it instead of standing in it. Control joints cut where the section is going to crack.

Tie the asphalt back in at the curb line

Asphalt cut tight to the new edge, compacted, joint sealed. An open joint at the back of a curb is a straight path into the base, which is what took the last one out.

What Usually Comes With It

The curb line is where the water runs, so what fails around it is usually connected.

This page is the curb line. For what curb and gutter costs by the linear foot, and for dock aprons, pads, sidewalks and the rest of the flatwork, see concrete.

Questions We Get

The plow took the nose off our curb. Does the whole section have to come out?
It depends on how far the break runs and what the face is doing behind it. Curb and gutter comes out and goes back joint to joint, so a section broken through gets replaced to the joints on either side of it rather than filled in the middle. A face that has tipped out of plumb is telling you the back of the curb has heaved, and that is a base problem underneath rather than a broken nose.
Why does the gutter wear out before the rest of the lot?
Because everything drains to it. Salt-loaded slush runs off the whole lot and sits in the gutter longer than anywhere else, so the gutter goes through more freeze and thaw cycles with more de-icer in the water than any other concrete on the property. That is why a gutter can be scaled and rough while the curb face two feet away still looks sound.
The curb is leaning out and there is a gap behind it. What causes that?
Meltwater that cannot get to the basin. It backs up behind the curb, freezes there, and frost pushes the back of the section up and tips the face out of plumb. Once the face has tipped, the joint between the curb and the asphalt is open, and every rain after that goes down the joint instead of along the gutter.
Our asphalt is failing along the curb before anywhere else. Are the two connected?
Usually. An open joint at the back of the curb is a straight path into the base under the asphalt, and asphalt sitting on a wet base breaks up under traffic. That is why a lot often fails in a strip along the curb line while the middle of it looks fine. Replacing the section and sealing that joint is what stops it coming back in the same place.
What holds a new section to the curb on either side of it?
Rebar dowels at the joint. Steel set into the ends of the existing curb and run into the new pour keeps the two sections in the same plane, so the joint stays a line rather than becoming a step. Where the curb turns, the forms are built to the radius instead of being faceted out of straight boards, so the finished curve is a curve and not a run of short straights.
We are cutting a new drive opening through the curb. What happens to the curb?
In Chippewa Falls the code answers it directly: where a drive opening is cut into existing curb and gutter, the entire curb and gutter is removed and reconstructed of concrete to form a standard drive opening (8.04(9)(a)), and it goes back within 30 days of the removal beginning (8.04(9)(d)). Other cities handle it their own way. In Eau Claire, work in the right of way runs through the Engineering department under 13.10.020.

Send a Photo of the Curb

One down the curb line from one end, and one straight at the worst section showing the gutter and the asphalt beside it. Whether the face is still plumb is most of the answer.

(715) 450-9897
What can we help with?